<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>b-panel &#187; Environmentally Friendly Building</title>
	<atom:link href="http://www.b-panel.com/category/news/environmentally-friendly/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.b-panel.com</link>
	<description>ENERGY-EFFICIENT &#38; QUAKE RESISTANT BUILDING SYSTEM, {blog} &#124; Sistem Bangunan Tahan gempa, Bangunan Hemat Energi, Bangunan Kedap Suhu</description>
	<lastBuildDate>Tue, 03 Nov 2026 09:57:31 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3.2</generator>
		<item>
		<title>EPS (“Styrofoam”) Recycling Program at PT Beton Elemenindo Putra</title>
		<link>https://www.b-panel.com/eps-recycling/</link>
		<comments>https://www.b-panel.com/eps-recycling/#comments</comments>
		<pubDate>Tue, 28 Jun 2016 00:00:10 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[Environmentally Friendly Building]]></category>
		<category><![CDATA[Green Building]]></category>
		<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://localhost/new_b-panel_3/?p=110</guid>
		<description><![CDATA[To recycle especially difficult materials or non-biodegradable waste, is very important to restore youthfulness of the Earth. Awareness to recycle not only implemented by the community, but also by some companies and factories. One example of a company that has been engaged in operation and production which is more responsible for preserving the earth is [...]]]></description>
			<content:encoded><![CDATA[<div style="clear:both;"></div>
<p align="justify">To recycle especially difficult materials or non-biodegradable waste, is very important to restore youthfulness of the Earth. Awareness to recycle not only implemented by the community, but also by some companies and factories. One example of a company that has been engaged in operation and production which is more responsible for preserving the earth is PT. Beton Elemenindo Putra, located in Batujajar, Bandung regency. This company, which produces <b>b-panel<sup>®</sup></b> and <b>b-deck<sup>®</sup></b>, an earthquake-resistant, energy-efficient building system, has engaged in the recycling process at its plant systematically. </p>
<p align="justify">One of the basic ingredients of this plant is EPS (expanded polystyrene). EPS or commonly known as Styrofoam, has been long regarded as a source of problematic waste, because it does not rot or decompose, so it tends to pile up on garbage dump sites. The irony is, that if EPS is used in building material as thermal insulation, the energy savings are significant, and because the EPS is not used in a “single-use” fashion (as in the case of decorating and wrapping / packaging), the environmental impacts will be much less – dwellings and buildings are designed to last for many years or even generations, so the non-biodegradable nature of EPS is compatible with the usage. The factory recycles EPS thoroughly and systematically, so that the raw material for EPS is used by as much as possible, and production waste is reduced, and even eliminated.</p>
<p align="center"><img src="http://bfoam.files.wordpress.com/2010/02/bagan_proses_daur_ulang.jpg?w=500&amp;h=367" alt="Bagan proses daur ulang styrofoam" border="0" /></p>
<p align="justify">The above diagram is process flow of PT. Beton Elemenindo Putra’s factory recycling process. The factory produces two types of EPS. First is the construction –grade EPS, which has flame-retarding property (commonly called EPS-FR) used as raw material for <b>b-panel<sup>®</sup></b> The second is “regular” EPS for decoration materials and packaging, which is commonly called EPS-RG. It is made with similar raw materials, except that EPS-RG is not fire retardant. From raw materials (EPS beads), EPS produced by passing the process of expansion and blocking. From blocking to the production of <b>b-panel<sup>®</sup></b> and <b>b-deck<sup>®</sup></b>, EPS-FR then processed in accordance with specified standards, and then is cut to sizes and shapes to the project’s specifications (Modular cutting list). </p>
<p><img src="http://www.b-panel.com/wp-content/uploads/Artikel/recycle/recycle-1.jpg"  width="300px"/><img src="http://www.b-panel.com/wp-content/uploads/Artikel/recycle/recycle-2.jpg" width="300px"/></p>
<p><img src="http://www.b-panel.com/wp-content/uploads/Artikel/recycle/recycle-3.jpg" width="600px"/></p>
<p align="justify">This process generates waste pieces of EPS-FR. EPS-FR chunks which condition meets the appropriate standards, are then crushed and combined again with a new (“virgin”) EPS-FR to make the next blocks of EPS-FR, which is then processed into the next batches of <b>b-panel<sup>®</sup></b> and <b>b-deck<sup>®</sup></b></p>
<p><img src="http://www.b-panel.com/wp-content/uploads/Artikel/recycle/recycle-4.jpg" height="210px"/><img src="http://www.b-panel.com/wp-content/uploads/Artikel/recycle/recycle-5.jpg" height="210px"/></p>
<p align="justify">For remaining pieces of EPS – FR which do not meet our standard, are not thrown away. The plant has an EPS melting facility as well. EPS waste is melted in a specially designed furnace, and then cast into hard polystyrene in the form of chips and ingots. Polystyrene chips and ingots are raw material for many everyday items, such as mobile phone casings, computer casing, etc.</p>
<p><img src="http://www.b-panel.com/wp-content/uploads/Artikel/recycle/recycle-6.jpg" height="224px"/><img src="http://www.b-panel.com/wp-content/uploads/Artikel/recycle/recycle-7.jpg" height="224px"/></p>
<p style="text-align: justify;">The EPS recycling is not only for own post-production EPS waste alone. The truck fleets of PT. Beton Elemenindo Putra pick up, without charge, styrofoam waste from companies and shops in various parts of Bandung and its surroundings, and take them to the facility. As a result, not only the factory production process <b>b-panel<sup>®</sup></b> produces very little waste (less than 0.3% in weight of production), the plant’s operation will also help reduce the buildup of waste Styrofoam in the city of Bandung and its surroundings.</p>
<p><img src="http://www.b-panel.com/wp-content/uploads/Artikel/recycle/recycle-8.jpg" height="210px"/><img src="http://www.b-panel.com/wp-content/uploads/Artikel/recycle/recycle-9.jpg" height="210px"/></p>
<p style="text-align: justify;">PT Beton Elemenindo Putra also works together with Bangkit Bersama Cooperative, which collects Styrofoam waste from all the Bandung’s waterways, which are naturally due to the flow of the local river systems (Cikapundung, Cisangkuy, Cibeureum, etc), float to the main river Citarum, ending up in the tributary of Saguling lake directly behind our factory. The collected styrofoam waste is then sorted and washed for routine delivery to the factory, to be processed into our many products. This synergy also extends to PT Indonesia Power, which operates the Saguling Hydroelectric dam, by cleaning up the pervasive waste of EPS Styrofoam and not clogging the water around the dam, the operation of the hydro turbine is assured.</p>
<p><img src="http://www.b-panel.com/wp-content/uploads/Artikel/recycle/recycle-10.jpg" height="210px"/><img src="http://www.b-panel.com/wp-content/uploads/Artikel/recycle/recycle-11.jpg" height="210px"/></p>
<p style="text-align: justify;">The cooperative runs a meticulously systematic operations to process EPS waste. After collection from the river (Greater Bandung generates up to 300 kg per day of Styrofoam waste!), the EPS waste is then sorted and cleaned, then dried in the sun before they are transported to PT Beton Elemenindo Putra </p>
<p><img src="http://www.b-panel.com/wp-content/uploads/Artikel/recycle/recycle-12.jpg" height="210px"/><img src="http://www.b-panel.com/wp-content/uploads/Artikel/recycle/recycle-13.jpg" height="210px"/></p>
<p style="text-align: justify;">In addition to implementing a systematic process of recycling, PT. Beton Elemenindo Putra also run other aspects of environmentally friendly production as well. For example: The factory utilizes a boiler that uses palm kernel shell) so that greenhouse gas emission is minimized. This is to ensure that this factory is truly environmentally-friendly as a whole, from the products to the manufacturing process itself. Especially in Indonesia’s building material manufacturing sector, PT. Beton Elemenindo Putra is a clear proponent of environmentally-conscious businesses in Indonesia.</p>
<p align="left">Source: <strong>Properti.biz Feb 2010, Techno Konstruksi Magazine edition 24 tahun 2010</strong></p>
<p align="left">Referensi Artikel: koran <strong>&#8220;Properti.biz&#8221; Febuari 2010</strong> &#91; <a title="Download scan porsi artikel b-panel di Properti.biz Febuari 2010" href="https://www.b-panel.com/wp-content/uploads/pdf/scan-Properti-biz-Feb-2010.pdf" target="_blank"><strong>PDF</strong></a> &#93;</p>
<p>
<strong>Related News:</strong></p>
<ul>
<li><a href="http://www.b-panel.com/sustainable-building-indonesia/">b-panel<sup>&reg;</sup> Campus Seminar: Educating Young Generation to Support Sustainable Building Practices</a></li>
<li><a href="http://www.b-panel.com/little-pt-beton-elemenindo-putra-lessen-environmental-impact/">Little Things PT Beton Elemenindo Putra Does to Further Lessen Environmental Impact</a></li>
<li><a href="http://www.b-panel.com/b-panel-support-greenship-assessment-project-green-building-council-indonesia/">b-panel<sup>&reg;</sup> to support Greenship assessment for your project by the Green Building Council Indonesia</a></li>
<li><a href="http://www.b-panel.com/june-2012-reduction-in-carbon-emission-from-the-use-of-b-panel/">Reduction in carbon emission from the use of b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/june-2012-broader-environmental-consideration-in-b-panel-production-process/">Broader environmental consideration in b-panel<sup>&reg;</sup> production process</a></li>
<li><a href="http://www.b-panel.com/april-2012-green-right-expo-2012/">Green Right Expo 2012</a></li>
<li><a href="http://www.b-panel.com/penghematan-biaya-air-conditioner/">Air Conditioner Cost Saving from Well-Insulated Dwelling</a></li>
<li><a href="http://www.b-panel.com/2011-11-designing-energy-efficient-dwelling/">Designing Energy-efficient Dwelling</a></li>
<li><a href="http://www.b-panel.com/2009-11-innovative-building-material-for-green-construction-civil-engineer-seminar-at-tarumanegara-university-2009-b-panel%C2%AE-marketing-team/">Innovative Building Material for Green Construction</a></li>
<li><a href="http://www.b-panel.com/2009-06-ecogreen-building-with-b-panel%C2%AE-properti-biz-june-2009/">EcoGreen Building With b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2009-01-energy-efficient-housing-with-b-panel®/">Energy Efficient Housing with b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2008-06-save-energy-with-the-b-panel/">Save Energy with the b-panel<sup>&reg;</sup></a></li>
</ul>
<p><em></em></p>
]]></content:encoded>
			<wfw:commentRss>https://www.b-panel.com/eps-recycling/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>b-panel Campus Seminar: Educating Young Generation to Support Sustainable Building Practices</title>
		<link>https://www.b-panel.com/sustainable-building-indonesia/</link>
		<comments>https://www.b-panel.com/sustainable-building-indonesia/#comments</comments>
		<pubDate>Wed, 18 Jun 2014 02:37:43 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[b-panel® Events]]></category>
		<category><![CDATA[Environmentally Friendly Building]]></category>
		<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.b-panel.com/?p=3375</guid>
		<description><![CDATA[Many of us have not had the concern to environment in development. By ‘environment’, we only thought of waste, litters, and environment contamination. But nowadays concern to environmental issues has expanded into designing and constructing a building. Building construction with awareness to environment, in practice, is often considered against economical growth, since the cost for [...]]]></description>
			<content:encoded><![CDATA[<p style="clear: both; text-align: justify;">Many of us have not had the concern to environment in development. By ‘environment’, we only thought of waste, litters, and environment contamination. But nowadays concern to environmental issues has expanded into designing and constructing a building.</p>
<p style="clear: both; text-align: justify;">Building construction with awareness to environment, in practice, is often considered against economical growth, since the cost for sustainable building is not cheap. In fact, sustainble building has a lot of positive impacts, for it contributes in mending microclimate and thus held global warming from getting worse, although usually a bit more expensive initially, in long term, the project will save substantial operational cost from energy savings.</p>
<div style="float:left;padding-top:5px;padding-left:5px;"><img src="http://www.b-panel.com/wp-content/uploads/Artikel/campus seminar/campus-seminar-1-low.jpg" width="500px" /></div>
<p style="clear: both;">
<p style="clear: both; text-align: justify;">b-panel<sup>&reg;</sup>, along with Beton Works (a federation of concrete-based building material producer, in which b-panel<sup>&reg;</sup> is one of them) continue to support a national seminar series with concern to sustainable building that is held in several universities in Indonesia. We are hoping to educate young generation in Indonesia, mainly the university students, about the importance of sustainable building.</p>
<p style="clear: both; text-align: justify;">The seminars were held in Universitas Bandar Lampung, Universitas Atma Jaya Yogyakarta, Universitas Sumatra Utara, and Universitas Bina Nusantara (Binus) Jakarta. The seminars explain the implementation of b-panel<sup>&reg;</sup> in sustainable bulding, along with other environmentally-friendly products from Beton Works.</p>
<p style="clear: both;">
<div style="float:left;padding-top:5px;padding-left:5px;"><img src="http://www.b-panel.com/wp-content/uploads/Artikel/campus seminar/campus-seminar-2-low.jpg" width="500px" /></div>
<p style="clear: both;">
<div style="float:left;padding-top:5px;padding-left:5px;"><img src="http://www.b-panel.com/wp-content/uploads/Artikel/campus seminar/campus-seminar-3-low.jpg" width="500px" /></div>
<p style="clear: both;">
<p style="clear: both; text-align: justify;">We no longer need to install walls by stacking the pieces of bricks (not to mention that they only function as partition walls); we can now install walls rapidly, with benefits of thermal and acoustic insulation included. In the future, these benefits will give long term profitability; such is the excellence of sustainable building.</p>
<p style="clear: both; text-align: justify;">Sustainable building is a concept that fulfill today’s need without ruining our successor’s ability to fulfill their needs. The main concern of eco-friendly building is to make it sustainable, to build and consume not more than necessary.</p>
<p style="clear: both; text-align: justify;">Sustainable building provides innovative and creative aspects in managing natural resources, in order to maintain its supply for the future. Preparation for future energy is our responsibility. So, sustainable building is a revolutionary idea that must be supported by everyone. This is a continuous movement which aspires to the creation of eco-friendly and energy efficient building, starting from conception, excecution, and selection of eco-friendly building materials. b-panel<sup>&reg;</sup> adopts Green Building concept which emphasizes on balance between short term gains versus long term risks, with a consideration for the health and prosperity of future generations</p>
<p>
<strong>Related News:</strong></p>
<ul>
<li><a href="http://www.b-panel.com/little-pt-beton-elemenindo-putra-lessen-environmental-impact/">Little Things PT Beton Elemenindo Putra Does to Further Lessen Environmental Impact</a></li>
<li><a href="http://www.b-panel.com/b-panel-support-greenship-assessment-project-green-building-council-indonesia/">b-panel<sup>&reg;</sup> to support Greenship assessment for your project by the Green Building Council Indonesia</a></li>
<li><a href="http://www.b-panel.com/june-2012-reduction-in-carbon-emission-from-the-use-of-b-panel/">Reduction in carbon emission from the use of b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/june-2012-broader-environmental-consideration-in-b-panel-production-process/">Broader environmental consideration in b-panel<sup>&reg;</sup> production process</a></li>
<li><a href="http://www.b-panel.com/april-2012-green-right-expo-2012/">Green Right Expo 2012</a></li>
<li><a href="http://www.b-panel.com/penghematan-biaya-air-conditioner/">Air Conditioner Cost Saving from Well-Insulated Dwelling</a></li>
<li><a href="Designing Energy-efficient Dwelling">Designing Energy-Efficient Dwelling</a></li>
<li><a href="http://www.b-panel.com/to-sell-eco-green-product/">To Sell Eco Green Product = Production Process Must be Green First</a></li>
<li><a href="http://www.b-panel.com/2009-11-innovative-building-material-for-green-construction-civil-engineer-seminar-at-tarumanegara-university-2009-b-panel%C2%AE-marketing-team/">Innovative Building Material for Green Construction</a></li>
<li><a href="http://www.b-panel.com/2009-06-ecogreen-building-with-b-panel%C2%AE-properti-biz-june-2009/">EcoGreen Building With b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2009-01-energy-efficient-housing-with-b-panel®/">Energy Efficient Housing with b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2008-06-save-energy-with-the-b-panel/">Save Energy with the b-panel<sup>&reg;</sup></a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>https://www.b-panel.com/sustainable-building-indonesia/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Little Things PT Beton Elemenindo Putra Does to Further Lessen Environmental Impact</title>
		<link>https://www.b-panel.com/little-pt-beton-elemenindo-putra-lessen-environmental-impact/</link>
		<comments>https://www.b-panel.com/little-pt-beton-elemenindo-putra-lessen-environmental-impact/#comments</comments>
		<pubDate>Mon, 28 Apr 2014 02:05:54 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[Environmentally Friendly Building]]></category>
		<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.b-panel.com/?p=3251</guid>
		<description><![CDATA[PT Beton Elemenindo Putra has ticked all the key marks when it comes to operational sustainability of its production facility. Due to their comprehensive efforts in ensuring environmental responsibility, the company has won two back-to-back prestigious environmental awards: the Regional (ASEAN) Merit Award at The Singapore Environmental Achievement Award in 2012, and the Sustainable Business [...]]]></description>
			<content:encoded><![CDATA[<p style="clear: both; text-align: justify;">PT Beton Elemenindo Putra has ticked all the key marks when it comes to operational sustainability of its production facility. Due to their comprehensive efforts in ensuring environmental responsibility, the company has won two back-to-back prestigious environmental awards: the Regional (ASEAN) Merit Award at The Singapore Environmental Achievement Award in 2012, and the Sustainable Business Award Indonesia for the best SME category in 2013. Their factory is one of the very few manufacturing sites in Indonesia, which boiler power does not rely on coal or other fossil fuels, as well as one that has achieved close to zero waste in their operation.</p>
<div style="float:left;padding-top:5px;padding-left:5px;"><img src="http://www.b-panel.com/wp-content/uploads/Artikel/Little Things BE/artikel-little-things-be-1-low.jpg" width="300px" /></div>
<p style="clear: both;">
<p style="clear: both; text-align: justify;">However, what also counts are the little actions that the company promotes in its daily operation. For example, due to the construction of a new factory on what used to be paddy field next to it, reduction of rain water seepage to the soil, and therefore reduction of ground water availability for the community around the factory, became a concern. Thus, the company constructed an array of biopori wells along the perimeter of its outer wall, as well as a ground water absorption polder tank, so that rain water not collected by the factory roof water collector, goes to the ground soil. This increases ground water availability for the surrounding community, and reduce surface erosion, not to mention potential flooding in the area during heavy downpour.</p>
<p style="clear: both;">
<img src="http://www.b-panel.com/wp-content/uploads/Artikel/Little Things BE/little-1.jpg" height="280px" /> <img src="http://www.b-panel.com/wp-content/uploads/Artikel/Little Things BE/little-2.jpg" height="280px" /></p>
<p style="clear: both;">
<div style="float:left;padding-top:5px;padding-left:0px;"><img src="http://www.b-panel.com/wp-content/uploads/Artikel/Little Things BE/artikel-little-things-be-3-low.jpg" width="300px" /></div>
<div style="float:left;padding-top:5px;padding-left:5px;"><img src="http://www.b-panel.com/wp-content/uploads/Artikel/Little Things BE/artikel-little-things-be-4-low.jpg" width="169px" /></div>
<p style="clear: both;">
<p style="clear: both; text-align: justify;">Another example is the downsizing of the firm’s vehicle fleet. The staff operational vehicles, which used to be 2000cc cars, are now smaller, more efficient 1000-1300 cc vehicles with similar passenger capacities. The management’s car is now a 1.5 liter compact crossover with efficient CVT transmission, downsized from a 3 liter, 6-cylinder large sedan. The most significant fuel efficiency gain is from the purchase of the new trucks fleet. Since most of PT. Beton Elemenindo Putra’s product lines comprise of ultralight weight EPS foam, instead of 4000cc and 7600cc diesel trucks used previously, the new fleet comprises of 1400cc and 2700cc diesel trucks, modified for very little compromise in cargo capacity, while delivering much higher fuel economy. The 1400cc truck, for example, monitored at over 10 km/liter to date. </p>
<p style="clear: both;">
<img src="http://www.b-panel.com/wp-content/uploads/Artikel/Little Things BE/little-3.jpg" height="210px" /> <img src="http://www.b-panel.com/wp-content/uploads/Artikel/Little Things BE/little-4.jpg" height="210px" /></p>
<p style="clear: both;">
<p style="clear: both; text-align: justify;">The company also runs a carpooling program, in which many of the staffs are using for their daily commute to work. Aside from lowering fuel cost of the company fleet, these actions concretely embrace one of b-panel<sup>®</sup>’s product objectives, which is energy efficiency.
 </p>
<div style="float:left;padding-top:5px;padding-left:5px;"><img src="http://www.b-panel.com/wp-content/uploads/Artikel/Little Things BE/artikel-little-things-be-6-low.jpg" width="600px" /></div>
<p style="clear: both;">
<p style="clear: both; text-align: justify;">There are a few more energy-efficiency measures being implemented and to be implemented at the company in the near future. In 2016, the boiler was retrofitted with extensive thermal jacket, to reduce the biofuel consumption further. For 2017, solar PV for all office lightings which double as centralized UPS system is planned.  The quest for PT Beton Elemenindo Putra to stay as one of the best practice cases for environmentally responsible operation continues.
 </p>
<p style="clear: both;">
<img src="http://www.b-panel.com/wp-content/uploads/Artikel/Little Things BE/little-5.jpg" height="220px" /> <img src="http://www.b-panel.com/wp-content/uploads/Artikel/Little Things BE/little-6.jpg" height="220px" /></p>
<p>
<strong>Related News:</strong></p>
<ul>
<li><a href="http://www.b-panel.com/sustainable-building-indonesia/">b-panel<sup>&reg;</sup> Campus Seminar: Educating Young Generation to Support Sustainable Building Practices</a></li>
<li><a href="http://www.b-panel.com/b-panel-support-greenship-assessment-project-green-building-council-indonesia/">b-panel<sup>&reg;</sup> to support Greenship assessment for your project by the Green Building Council Indonesia</a></li>
<li><a href="http://www.b-panel.com/june-2012-reduction-in-carbon-emission-from-the-use-of-b-panel/">Reduction in carbon emission from the use of b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/june-2012-broader-environmental-consideration-in-b-panel-production-process/">Broader environmental consideration in b-panel<sup>&reg;</sup> production process</a></li>
<li><a href="http://www.b-panel.com/april-2012-green-right-expo-2012/">Green Right Expo 2012</a></li>
<li><a href="http://www.b-panel.com/penghematan-biaya-air-conditioner/">Air Conditioner Cost Saving from Well-Insulated Dwelling</a></li>
<li><a href="Designing Energy-efficient Dwelling">Designing Energy-Efficient Dwelling</a></li>
<li><a href="http://www.b-panel.com/to-sell-eco-green-product/">To Sell Eco Green Product = Production Process Must be Green First</a></li>
<li><a href="http://www.b-panel.com/2009-11-innovative-building-material-for-green-construction-civil-engineer-seminar-at-tarumanegara-university-2009-b-panel%C2%AE-marketing-team/">Innovative Building Material for Green Construction</a></li>
<li><a href="http://www.b-panel.com/2009-06-ecogreen-building-with-b-panel%C2%AE-properti-biz-june-2009/">EcoGreen Building With b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2009-01-energy-efficient-housing-with-b-panel®/">Energy Efficient Housing with b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2008-06-save-energy-with-the-b-panel/">Save Energy with the b-panel<sup>&reg;</sup></a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>https://www.b-panel.com/little-pt-beton-elemenindo-putra-lessen-environmental-impact/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>April 2013 &#124; b-panel to support Greenship assessment for your project by the Green Building Council Indonesia</title>
		<link>https://www.b-panel.com/b-panel-support-greenship-assessment-project-green-building-council-indonesia/</link>
		<comments>https://www.b-panel.com/b-panel-support-greenship-assessment-project-green-building-council-indonesia/#comments</comments>
		<pubDate>Wed, 10 Apr 2013 10:09:24 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[b-panel® Events]]></category>
		<category><![CDATA[Energy Efficient Building]]></category>
		<category><![CDATA[Environmentally Friendly Building]]></category>
		<category><![CDATA[Green Building]]></category>
		<category><![CDATA[News]]></category>
		<category><![CDATA[Bangunan]]></category>
		<category><![CDATA[Bangunan Hijau]]></category>
		<category><![CDATA[Bangunan Ramah Lingkungan]]></category>
		<category><![CDATA[Building]]></category>
		<category><![CDATA[Greenship]]></category>

		<guid isPermaLink="false">http://www.b-panel.com/?p=2941</guid>
		<description><![CDATA[Green Building Council Indonesia (GBCI) is a non-profit organization, which mission is to promote environmentally-friendly buildings in Indonesia. This organization, headed by Madam Naning Adiwoso, has been actively educating Indonesia’s developers and architects, to better understand and apply design elements, material choice, and construction process, which minimize the environmental impact during the project’s construction as [...]]]></description>
			<content:encoded><![CDATA[<p style="text-align: left;"><img src="http://www.b-panel.com/wp-content/uploads/news/green-1-low.jpg" alt="" width="276" height="75" /></p>
<p style="text-align: left;"><img src="http://www.b-panel.com/wp-content/uploads/news/green-2-low.jpg" alt="" width="279" height="68" /></p>
<p style="clear: both; text-align: justify;">Green Building Council Indonesia (GBCI) is a non-profit organization, which mission is to promote environmentally-friendly buildings in Indonesia. This organization, headed by Madam Naning Adiwoso, has been actively educating Indonesia’s developers and architects, to better understand and apply design elements, material choice, and construction process, which minimize the environmental impact during the project’s construction as well as throughout its operations, and to attain the most efficient use of energy.</p>
<p style="text-align: center;"><img src="http://www.b-panel.com/wp-content/uploads/news/green-3-low.jpg" alt="" width="600" /></p>
<p style="clear: both; text-align: center;"><strong>Photo Madam Naning Adiwoso and staffs of PT. Beton Elemenindo Putra in front of b-panel<sup>®</sup> booth at Greenright Expo 2013, JCC Senayan Jakarta.</strong></p>
<p style="clear: both;" align="justify">Starting from April 23, 2013, according to DKI Jakarta Governor decree No. 38/2012 on green buildings, all projects of certain sizes located in Jakarta has to be assessed with Greenship scoring system. Example of buildings that fall into this category:</p>
<ul>
<li>Office buildings, shopping malls, apartements &gt; 50.000 m2</li>
<li>Hotels, hospitals &gt; 20.000 m2</li>
<li>Education facilities/schools &gt; 10.000 m2</li>
</ul>
<p style="clear: both;" align="justify">GBCI’s Greenshhip assessment system has actually been introduced in 2012,and now is formally made into a formal requirement. The higher the score, the higher the rating bestowed upon the project.</p>
<table width="503" border="0" cellspacing="0" cellpadding="0">
<tbody>
<tr>
<td colspan="2" height="35"><strong>Ratings for GREENSHIP (Version 1.1)</strong></td>
<td rowspan="2" width="164"><strong>Final Assesment (FA) stage:</strong></td>
</tr>
<tr>
<td colspan="2" height="43"><strong>Design Recognition (DR) stage: </strong></td>
</tr>
<tr>
<td width="153">Platinum</td>
<td width="186">Minimum percentage 73% 56 points</td>
<td>Minimum percentage 73% 74 points</td>
</tr>
<tr>
<td>Gold</td>
<td>Minimum percentage 57% 33 points</td>
<td>Minimum percentage 57% 58 points</td>
</tr>
<tr>
<td>Silver</td>
<td>Minimum percentage 46% 35 points</td>
<td>Minimum percentage 46% 47 points</td>
</tr>
<tr>
<td>Bronze</td>
<td>Minimum percentage 35% 27 points</td>
<td>Minimum percentage 35% 35 points</td>
</tr>
</tbody>
</table>
<p align="justify">The higher the rating, the more incentive that the government can offer, ranging from land and building tax (PBB) as well as streamlining of building permit application. On top of this, the building can be marketed more attractively, and it is the future trend that environmentally-friendly and energy efficient buildings are becoming more desirable. Market awareness of environmental issues has become more acute, and the cost of fuel and electricity is going up.</p>
<p align="justify"><strong> “Since regulation is in effect starting 23 April [2013], building permits are only given after a proposed project fulfill the criteria of green building”</strong></p>
<p align="justify"><strong> – Mr. I Putu Ngurah Indiana (head of Jakarta‘s building monitoring and enforcement) at International Finance Corporation (IFC), green building seminar, 12 April 2013 -</strong></p>
<p style="text-align: center;"><img src="http://www.b-panel.com/wp-content/uploads/news/green-4-low.jpg" alt="" width="573" height="313" /></p>
<p style="clear: both; text-align: center;"><strong>Greenship certification billboard of a project at Mega Kuningan area, Jakarta </strong></p>
<p align="justify">Greenlisting Indonesia Volume 2, published by Green Building Council Indonesia this April, list a slew of environmentally-responsible building materials. The use of these products contribute to ensuring a project qualifies as green building. For details on Greenship criteria, please download here: <a href="http://www.gbcindonesia.org/">http://www.gbcindonesia.org/</a></p>
<p style="text-align: center;"><img src="http://www.b-panel.com/wp-content/uploads/news/green-5-low.jpg" alt="" width="207" height="266" /></p>
<p style="clear: both; text-align: center;"><strong>Greenlisting Vol.2 </strong></p>
<p style="clear: both;" align="justify">The use of b-panel<sup>®</sup>, holistically combined with other planned elements and building materials, such as thermally insulated windows and door seals, solar water heating, and systematic waste water treatment system, will ensure a commendable Greenship rating. The following are some of the criteria and details on how b-panel<sup>®</sup> fulfills these criteria:</p>
<ol>
<li><strong><span style="text-decoration: underline;">EEC 1/EEC P2: Energy-Efficiency Measures</span></strong>The use of b-panel<sup>®</sup> will reduce the thermal leak and air-conditioning load, and therefore improve the Overall Thremal Transfer Value (OTTV) of the building. On the opposite, the use of conventional concrete roof deck and brick walls are gross disregard for energy efficiency and thermal comfort, because beside the heat intrusion to the building interior, the wall and roof deck which are exposed to the solar heat act as thermal capacitor/heat reservoir, which keep warming up the rooms well into the evening. <strong>Rating potential:</strong> Max. 5-20 points</li>
<li><strong><span style="text-decoration: underline;">MRC 2: Environment Friendly Materials</span></strong>GREENSHIP assessment: The use of recycled material equal to at least 5% of the project value. Details: b-foam<sup>®</sup> EPS utilized for b-panel<sup>®</sup> has at least 15% recycled content from processing waste of previous projects. <strong>Rating potentia</strong>l: 3 points</li>
<li><strong><span style="text-decoration: underline;">MRC 5: Prefab Material</span></strong>GREENSHIP assessment: Design utilizing modular or prefabricated material (Not including equipment) of at least 30% of total material cost.<br />
Details: The use of b-panel<sup>®</sup> enables total prefabrication method and thus significantly reducing project waste<br />
<strong>Rating potentia</strong>l: 3 points</li>
<li><strong><span style="text-decoration: underline;">IHC 6: Thermal Comfort</span></strong>GREENSHIP assessment: Design of stable room temperature of 25C and 60% relative humidity Details: Thermal insulation layer of b-panel® help reduce heat intrusion to the interior of building, while the low moisture absorption of b-foam<sup>®</sup> EPS ensures stable humidity level of the building <strong>Rating potential</strong>: 1 point</li>
<li><strong><span style="text-decoration: underline;">IHC 7: Acoustic Level</span></strong>GREENSHIP assessment: Noise level of 90% of nett lettable area (NLA) not exceeding SNI 03-6386-2000 recommendation on noise level and vibration level for building and dwelling. Details: “Mass and damper” sandwich construction of b-panel<sup>®</sup> offers lower sound intrusion while keeping the wall weight in check. <strong>Rating potential</strong>: 1 point</li>
<li><strong><span style="text-decoration: underline;">MRC 6: Regional Material</span></strong>GREENSHIP assessment:
<ol>
<li>The use of products which raw materials and production facility is within 1.000 km from project site, for at least 50% of total material costs.</li>
<li>Utilizing products that are made within Indonesian territory for at least 80% of total material costs.</li>
</ol>
<p><strong>Details</strong>: all raw materials for b-panel<sup>®</sup> manufacturing are sourced within Indonesian territory*, and within 1000 km from the factory<br />
<strong>Rating potential</strong>: 2 points<br />
(*Exception is imported carbon-graphite EPS used in b-panel<sup>®</sup> Neo)</li>
</ol>
<p align="justify">From the above factors, the application of b-panel<sup>®</sup> can significantly add to Greenship assessment points, to provide the highest Greenship score to projects that utilize it.</p>
<p style="text-align: center;"><img src="http://www.b-panel.com/wp-content/uploads/news/green-6-low.jpg" alt="" width="277" height="370" /></p>
<p style="clear: both;" align="justify"><strong>“Green building is expensive? While the initial investment can be 2% higher, but if properly designed, a 20% savings can be realized throughout its construction” </strong></p>
<p><strong>– Mr. Setyo (head of Real Estate Association Indonesia (REI), Jakarta chapter) @ Green Property Awards 2012 at Hotel Santika, Jakarta –</strong></p>
<p>
<strong>Related News:</strong></p>
<ul>
<li><a href="http://www.b-panel.com/sustainable-building-indonesia/">b-panel<sup>&reg;</sup> Campus Seminar: Educating Young Generation to Support Sustainable Building Practices</a></li>
<li><a href="http://www.b-panel.com/little-pt-beton-elemenindo-putra-lessen-environmental-impact/">Little Things PT Beton Elemenindo Putra Does to Further Lessen Environmental Impact</a></li>
<li><a href="http://www.b-panel.com/june-2012-reduction-in-carbon-emission-from-the-use-of-b-panel/">Reduction in carbon emission from the use of b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/june-2012-broader-environmental-consideration-in-b-panel-production-process/">Broader environmental consideration in b-panel<sup>&reg;</sup> production process</a></li>
<li><a href="http://www.b-panel.com/april-2012-green-right-expo-2012/">Green Right Expo 2012</a></li>
<li><a href="http://www.b-panel.com/penghematan-biaya-air-conditioner/">Air Conditioner Cost Saving from Well-Insulated Dwelling</a></li>
<li><a href="Designing Energy-efficient Dwelling">Designing Energy-Efficient Dwelling</a></li>
<li><a href="http://www.b-panel.com/to-sell-eco-green-product/">To Sell Eco Green Product = Production Process Must be Green First</a></li>
<li><a href="http://www.b-panel.com/2009-11-innovative-building-material-for-green-construction-civil-engineer-seminar-at-tarumanegara-university-2009-b-panel%C2%AE-marketing-team/">Innovative Building Material for Green Construction</a></li>
<li><a href="http://www.b-panel.com/2009-06-ecogreen-building-with-b-panel%C2%AE-properti-biz-june-2009/">EcoGreen Building With b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2009-01-energy-efficient-housing-with-b-panel®/">Energy Efficient Housing with b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2008-06-save-energy-with-the-b-panel/">Save Energy with the b-panel<sup>&reg;</sup></a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>https://www.b-panel.com/b-panel-support-greenship-assessment-project-green-building-council-indonesia/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>June 2012 &#124; Reduction in carbon emission from the use of b-panel</title>
		<link>https://www.b-panel.com/june-2012-reduction-in-carbon-emission-from-the-use-of-b-panel/</link>
		<comments>https://www.b-panel.com/june-2012-reduction-in-carbon-emission-from-the-use-of-b-panel/#comments</comments>
		<pubDate>Tue, 26 Jun 2012 06:45:29 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[Energy Efficient Building]]></category>
		<category><![CDATA[Environmentally Friendly Building]]></category>
		<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.b-panel.com/?p=2217</guid>
		<description><![CDATA[From closely interacting with a Singapore-based environmental consultant, PT. Beton Elemenindo Putra attempted to quantify the carbon emission reduction from b-panel® adoption in each of the projects that we have completed to date. b-foam® EPS insulation on the entire wall surface of b-panel® effectively blocks outside heat from penetrating into the building. This would significantly [...]]]></description>
			<content:encoded><![CDATA[<p style="clear: both;">From closely interacting with a Singapore-based environmental consultant, PT. Beton Elemenindo Putra attempted to quantify the <strong>carbon emission reduction</strong> from <span class="logo_b-panel_text">b-panel<sup>®</sup></span> adoption in each of the projects that we have completed to date.</p>
<p><span class="logo_b-panel_text">b-foam<sup>®</sup></span> EPS insulation on the entire wall surface of <span class="logo_b-panel_text">b-panel<sup>®</sup></span> effectively blocks outside heat from penetrating into the building. This would significantly reduce the operating load of air conditioning (A/C). A/C is the largest source of energy consumption in a typical house in Indonesia, at almost 40% from the total consumption. For example, the operation cost of a typical hotel is dominated by A/C.</p>
<p style="text-align: center;"><img style="float: left;" src="https://www.b-panel.com/wp-content/uploads/news/pengurangan-emisi-1.jpg" alt="" width="330px" /><img src="https://www.b-panel.com/wp-content/uploads/news/pengurangan-emisi-2.jpg" alt="" width="300px" /></p>
<p style="clear: both;"><span class="logo_b-panel_text">b-panel<sup>®</sup></span> application for exterior wall will reduce the heat transfer from ambient air as well as sun intensity. In theory, <span class="logo_b-panel_text">b-panel<sup>®</sup></span> <strong>wall</strong> can reduce heat transfer by more than 90%. However, due to thermal leaks from areas other than the walls, such as air gaps on doors and window openings, as well as through glass and window frames, the actual heat transfer reduction is lower. Nevertheless, it is estimated that around 40%, of approximately 100Watt per m2 floor space of heat transfer will be reduced from the use of <span class="logo_b-panel_text">b-panel<sup>®</sup></span>. (For detailed analysis, please see http://www.b-panel.com/penghematan-biaya-air-conditioner)</p>
<p>Using several reasonable assumptions, such as a utilization rate of 14 hours per day, and 300 days per year, 3700 MWh per annum of electricity power savings is obtained. For Jawa-Bali grid, due to the domination of fossil fuel as the predominant electrical generation mode, especially the high-carbon content coal, the emission factor of Java-Bali grid is high, at 0.728. Thus, it is very important for all of us to be mindful about our electricity consumption. Although one can claim that he or she has the means to afford a huge electricity bill, the price to pay by our grandchildren living in a damaged environment will be too high to bear.</p>
<p style="text-align: center;"><img style="float: left;" src="https://www.b-panel.com/wp-content/uploads/news/pengurangan-emisi-3.jpg" alt="" /><img src="https://www.b-panel.com/wp-content/uploads/news/pengurangan-emisi-4.jpg" alt="" width="318px" /></p>
<p style="clear: both;">From the analysis results, the use of <span class="logo_b-panel_text">b-panel<sup>®</sup></span> at the projects completed to date is already reducing 2700 tons of carbon emission each year. This carbon reduction benefit is significant and permanent, where as long as the dwelling being occupied or office being rented. As discussed in a previous article http://www.b-panel.com/2011-09-thermal-test-result-for-b-panel-wall-and-roof-deck, what is happening today is an accelerated global warming, where increased A/C consumption due to the heat in turn causes more CO2 from power generator to be released into the atmosphere, and speed up the warming, and so on. It is PT Beton Elemenindo Putra’s goal to help slow down, or even reverse this vicious cycle.</p>
<p style="text-align: center;"><img style="float: left;" src="https://www.b-panel.com/wp-content/uploads/news/pengurangan-emisi-5.jpg" alt="" width="300px" /><img src="https://www.b-panel.com/wp-content/uploads/news/pengurangan-emisi-6.jpg" alt="" width="300px" /></p>
<p style="clear: both;">Beside the environmentally-beneficial application of <span class="logo_b-panel_text">b-panel<sup>®</sup></span>, <span class="logo_b-panel_text">b-panel<sup>®</sup></span> production process also has carbon reduction in mind. By using 100% biomass (palm kernel shell) for our boiler, PT. Beton Elemenindo Putra pursues the lowest possible carbon footprint in producing <span class="logo_b-panel_text">b-panel<sup>®</sup></span>.</p>
<p>We hope from the increased <span class="logo_b-panel_text">b-panel<sup>®</sup></span> project portfolio (60 locations to date and counting), our contribution in lowering carbon emission will be significant. With the amount of carbon being released to the atmosphere – For example, a typical coal-fired electrical generator emits more than a million tons of CO2 per year – it is extremely important for those who already realize the foolishness of environmental destruction by humans, to act as soon as possible.</p>
<p style="text-align: center;"><img src="https://www.b-panel.com/wp-content/uploads/news/pengurangan-emisi-7.jpg" alt="" /></p>
<p>For its carbon-footprint reducing properties, mindful production process, and methodical installation<br />
philosophy, <span class="logo_b-panel_text">b-panel<sup>®</sup></span> was selected as the Merit Winner for the 2012 Singapore Environmental Achievement Award (SEAA), for the Regional (ASEAN) category.</p>
<p style="text-align: center;"><img src="https://www.b-panel.com/wp-content/uploads/images/SEAA_LOGO_1.jpg" alt="" width="300px" /></p>
<p>
<strong>Related News:</strong></p>
<ul>
<li><a href="http://www.b-panel.com/sustainable-building-indonesia/">b-panel<sup>&reg;</sup> Campus Seminar: Educating Young Generation to Support Sustainable Building Practices</a></li>
<li><a href="http://www.b-panel.com/little-pt-beton-elemenindo-putra-lessen-environmental-impact/">Little Things PT Beton Elemenindo Putra Does to Further Lessen Environmental Impact</a></li>
<li><a href="http://www.b-panel.com/b-panel-support-greenship-assessment-project-green-building-council-indonesia/">b-panel<sup>&reg;</sup> to support Greenship assessment for your project by the Green Building Council Indonesia</a></li>
<li><a href="http://www.b-panel.com/june-2012-broader-environmental-consideration-in-b-panel-production-process/">Broader environmental consideration in b-panel<sup>&reg;</sup> production process</a></li>
<li><a href="http://www.b-panel.com/april-2012-green-right-expo-2012/">Green Right Expo 2012</a></li>
<li><a href="http://www.b-panel.com/penghematan-biaya-air-conditioner/">Air Conditioner Cost Saving from Well-Insulated Dwelling</a></li>
<li><a href="http://www.b-panel.com/2011-11-designing-energy-efficient-dwelling/">Designing Energy-Efficient Dwelling</a></li>
<li><a href="http://www.b-panel.com/to-sell-eco-green-product/">To Sell Eco Green Product = Production Process Must be Green First</a></li>
<li><a href="http://www.b-panel.com/2009-11-innovative-building-material-for-green-construction-civil-engineer-seminar-at-tarumanegara-university-2009-b-panel%C2%AE-marketing-team/">Innovative Building Material for Green Construction</a></li>
<li><a href="http://www.b-panel.com/2009-06-ecogreen-building-with-b-panel%C2%AE-properti-biz-june-2009/">EcoGreen Building With b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2009-01-energy-efficient-housing-with-b-panel®/">Energy Efficient Housing with b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2008-06-save-energy-with-the-b-panel/">Save Energy with the b-panel<sup>&reg;</sup></a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>https://www.b-panel.com/june-2012-reduction-in-carbon-emission-from-the-use-of-b-panel/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>June 2012 &#124; Broader environmental consideration in b-panel production process</title>
		<link>https://www.b-panel.com/june-2012-broader-environmental-consideration-in-b-panel-production-process/</link>
		<comments>https://www.b-panel.com/june-2012-broader-environmental-consideration-in-b-panel-production-process/#comments</comments>
		<pubDate>Tue, 12 Jun 2012 03:04:02 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[Environmentally Friendly Building]]></category>
		<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.b-panel.com/?p=2180</guid>
		<description><![CDATA[b-panel&#174; is a comprehensively environmentally-conscious product. From its contribution to significant and permanent A/C electricity consumption reduction due to the superior R-value of its b-foam&#174; EPS insulation, to its installation method &#8211; based on “zero-waste” philosophy where project waste is minimized or even eliminated, due to the fact that b-panel&#174; is shipped pre-cut and pre-shaped [...]]]></description>
			<content:encoded><![CDATA[<p style="clear:both;"><font class="logo_b-panel_text">b-panel<sup>&reg;</sup></font> is a comprehensively environmentally-conscious product. From its contribution to significant and permanent A/C electricity consumption reduction due to the superior R-value of its <font class="logo_b-panel_text">b-foam<sup>&reg;</sup></font> EPS insulation, to its installation method &#8211; based on “zero-waste” philosophy where project waste is minimized or even eliminated, due to the fact that <font class="logo_b-panel_text">b-panel<sup>&reg;</sup></font> is shipped pre-cut and pre-shaped according to specific projects requirements, all the way to its holistically responsible production process, such as recycling 100% of panel EPS production waste to make the next batch of panels, and 100% biomass fired boiler, a novelty in the place where burning cheap but environmentally damaging coal is the norm.</p>
<p style="text-align:center;">
<img src="https://www.b-panel.com/wp-content/uploads/news/pjl-1.png">
</p>
<p>In our quest to always improve its standing as an environmentally responsible business, PT Beton Elemenindo Putra conducts an innovative recycling program for its waste regular (RG) EPS (non-fire retardant foam for traditional applications, such as packaging and decoration), by blending RG EPS, after the debris have been crushed by a state-of the art recycling unit based on Japanese technology, into the fire-retardant (FR) EPS foam mix, which is the staple raw material for <font class="logo_b-panel_text">b-panel<sup>&reg;</sup></font>.  The content level of recycled RG EPS is strictly measured, to ensure that the Fire-retardant property of the foam meets the minimum standard. PT. Beton’s R&#038;D team has systematically analyzed the fire-retardant behavior of various FR-RG EPS mix, and has determined a certain mix percentage that is safe for this application. Customer’s safety of <font class="logo_b-panel_text">b-panel<sup>&reg;</sup></font> is always the outmost importance for PT Beton Elemenindo Putra. PT Beton Elemenindo Putra intends to use this foam design mix in the long run, mostly to help reduce the negative environmental impact associated with waste EPS foam (more commonly known as Styrofoam) which until today is still a pervasive environmental problem, due to the fact that it takes hundreds of years for nature to break it down, resulting in EPS debris floating on our waterways, river, choke wildlife, and contribute to flooding as they clog waterways.</p>
<p style="text-align:center;">
<img src="https://www.b-panel.com/wp-content/uploads/news/pjl-2.png" style="float:left;"><img src="https://www.b-panel.com/wp-content/uploads/news/pjl-3.jpg">
</p>
<p>Beside recycling our own RG EPS waste, PT. Beton Elemenindo Putra has for a while offers recycled-blend EPS (as well as recycling 100% of FR EPS for our panels that has been practiced for quite a while), PT Beton Elemenindo Putra also offers to collect EPS waste from all the shops and business around greater Bandung. The impact should be extremely positive – instead of ending up clogging waterways, EPS waste morphs info energy-saving material for people’s dwelling.</p>
<p style="text-align:center;">
<img src="https://www.b-panel.com/wp-content/uploads/news/pjl-4.png">
</p>
<p>Beside the EPS recycling program, PT. Beton Elemenindo Putra also organize environmentally-sound practice within our daily activities. Examples are our rainwater collecting roof, which saves us a significant amount of public utility water consumption, and staff waste recycling program, which sorts the waste into paper, plastic, and organic waste. Organic waste is mixed with palm shell waste from the boiler operation, to be buried on soil as they are geo-compatible, while plastic waste, such as drink bottle and plastic bags, are collected to be supplied to garbage collection business.</p>
<p style="text-align:center;">
<img src="https://www.b-panel.com/wp-content/uploads/news/pjl-5.jpg">
</p>
<p style="text-align:center;">
<img src="https://www.b-panel.com/wp-content/uploads/news/pjl-6.jpg">
</p>
<p>RG Foam blending into b-panel is PT. Beton Elemenindo Putra’s latest move to keep addressing the remaining environmental issues we face within our production process, and at this moment our R&#038;D team continues to explore other innovative ideas to achieve our goal to be a truly significant part of the solution, and not part of the problem, to our increasingly fragile environments.</p>
<p style="text-align:center;">
<img src="https://www.b-panel.com/wp-content/uploads/news/pjl-7.jpg">
</p>
<p>
For its carbon-footprint reducing properties, mindful production process, and methodical installation<br />
philosophy, <font class="logo_b-panel_text">b-panel<sup>&reg;</sup></font> was selected as the Merit Winner for the 2012 Singapore Environmental Achievement Award (SEAA), for the Regional (ASEAN) category.
</p>
<p style="text-align:center;">
<img src="https://www.b-panel.com/wp-content/uploads/images/SEAA_LOGO_1.jpg" width="300px">
</p>
<p>
<strong>Related News:</strong></p>
<ul>
<li><a href="http://www.b-panel.com/sustainable-building-indonesia/">b-panel<sup>&reg;</sup> Campus Seminar: Educating Young Generation to Support Sustainable Building Practices</a></li>
<li><a href="http://www.b-panel.com/little-pt-beton-elemenindo-putra-lessen-environmental-impact/">Little Things PT Beton Elemenindo Putra Does to Further Lessen Environmental Impact</a></li>
<li><a href="http://www.b-panel.com/b-panel-support-greenship-assessment-project-green-building-council-indonesia/">b-panel<sup>&reg;</sup> to support Greenship assessment for your project by the Green Building Council Indonesia</a></li>
<li><a href="http://www.b-panel.com/june-2012-reduction-in-carbon-emission-from-the-use-of-b-panel/">Reduction in carbon emission from the use of b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/april-2012-green-right-expo-2012/">Green Right Expo 2012</a></li>
<li><a href="http://www.b-panel.com/penghematan-biaya-air-conditioner/">Air Conditioner Cost Saving from Well-Insulated Dwelling</a></li>
<li><a href="Designing Energy-efficient Dwelling">Designing Energy-Efficient Dwelling</a></li>
<li><a href="http://www.b-panel.com/to-sell-eco-green-product/">To Sell Eco Green Product = Production Process Must be Green First</a></li>
<li><a href="http://www.b-panel.com/2009-11-innovative-building-material-for-green-construction-civil-engineer-seminar-at-tarumanegara-university-2009-b-panel%C2%AE-marketing-team/">Innovative Building Material for Green Construction</a></li>
<li><a href="http://www.b-panel.com/2009-06-ecogreen-building-with-b-panel%C2%AE-properti-biz-june-2009/">EcoGreen Building With b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2009-01-energy-efficient-housing-with-b-panel®/">Energy Efficient Housing with b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2008-06-save-energy-with-the-b-panel/">Save Energy with the b-panel<sup>&reg;</sup></a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>https://www.b-panel.com/june-2012-broader-environmental-consideration-in-b-panel-production-process/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>April 2012 &#124; GREEN RIGHT EXPO 2012</title>
		<link>https://www.b-panel.com/april-2012-green-right-expo-2012/</link>
		<comments>https://www.b-panel.com/april-2012-green-right-expo-2012/#comments</comments>
		<pubDate>Fri, 20 Apr 2012 02:06:07 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[b-panel® Events]]></category>
		<category><![CDATA[Energy Efficient Building]]></category>
		<category><![CDATA[Environmentally Friendly Building]]></category>
		<category><![CDATA[Green Building]]></category>
		<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.b-panel.com/?p=2258</guid>
		<description><![CDATA[The concept of eco-friendly lately becomes very popular and important in products or services. This is not excessive considering the poor environmental condition due to human activities. Environment-friendly is defined as all the things that refer to products, services, policies, and procedures which do not harm the environment. In the construction area, the relevant subject [...]]]></description>
			<content:encoded><![CDATA[<div style="text-align:center;">
<div>
		<img src="https://www.b-panel.com/wp-content/uploads/news/greenright-1.jpg" >
	</div>
</div>
<p style="clear:both;">The concept of eco-friendly lately becomes very popular and important in products or services. This is not excessive considering the poor environmental condition due to human activities. Environment-friendly is defined as all the things that refer to products, services, policies, and procedures which do not harm the environment. In the construction area, the relevant subject is green building.</p>
<p>Green building, also called green construction or sustainable building, refers to the structure and the use of construction process which are environmentally friendly and energy-efficient in all aspects of the building. One of the organizations that is committed to green building practice is the Green Building Council of Indonesia. On April 2012 GBC Indonesia held GREENRIGHT Conference and Expo 2012 at Jakarta Convention Center (JCC). The main purpose of this event was to bring more information to the regulators, professionals, industry players, academia/students, and environmentalists, in order to understand, make decision, and introduce practice of green building in Indonesia. This expected to create market and behavior transformation, so the application of the concept of green building can run efficiently and sustainably.</p>
<p>At the event, aside from environmental experts, businesses of eco-friendly products also contributed, including PT. Beton Elemenindo Putra, with <font class="logo_b-panel_text">b-panel<sup>&reg;</sup></font> as its flagship product. With the theme &#8220;Adapt to Sustain&#8221; GREENRIGHT 2012 invited industry players, and the general public to work together to become the agent of change towards green and sustainable tomorrow. GREENRIGHT provided an opportunity for industry players to exhibit their environment friendly products, so as to give information for those which want to implement the concept of green building.</p>
<div style="text-align:center;">
<div>
		<img src="https://www.b-panel.com/wp-content/uploads/news/greenright-2.jpg" style="width: 300px;padding-right:30px;" ><img src="https://www.b-panel.com/wp-content/uploads/news/greenright-3.jpg" >
	</div>
</div>
<p style="clear:both;">PT. Beton Elemenindo Putra, in accordance with the vision of &#8220;21st-century residence that is energy-efficient and save lives&#8221;, is worthy of being one of the green products industry players. Whether we realize it or not, our house can be one of the producers of greenhouse gases. Among them is power consumption of A/C that uses about 40% of electrical energy. The need for comfort to be found in the house will be a boomerang for the balance of the ecosystem. The use of <font class="logo_b-panel_text">b-panel<sup>&reg;</sup></font> can reduce the consumption of A/C by 35-40%, this helps in reducing carbon emissions (Java-Bali grid is predominately coal-fired), so the concept of environmentally responsible buildings become manifested. What often concepts of &#8220;eco&#8221; have been applied at PT. Beton Elemenindo Putra? Many more, from the rainwater-harvesting factory building roof, the use of non-fossil fuel for their boiler, to the recycling of EPS panel chunks.</p>
<div style="text-align:center;">
<div>
		<img src="https://www.b-panel.com/wp-content/uploads/news/greenright-4.jpg" style="padding-right:30px;" ><img src="https://www.b-panel.com/wp-content/uploads/news/greenright-5.jpg" >
	</div>
<p>	<br style="clear:both;"></p>
<div>
		<img src="https://www.b-panel.com/wp-content/uploads/news/greenright-6.jpg" >
	</div>
</div>
<p>Through this event we look forward for the public to become more familiar, understanding, and to regard <font class="logo_b-panel_text">b-panel<sup>&reg;</sup></font> as a sustainable building products. Through the seminars which are held, <font class="logo_b-panel_text">b-panel<sup>&reg;</sup></font> engineering team also had the opportunity to broaden their green building knowledge, especially through listening to prominent speakers in Indonesia and abroad, such as Nigel Grier, Associate Professor Mark Luther, and Mrs. Naning Adiwoso.</p>
<p>
<strong>Related News:</strong></p>
<ul>
<li><a href="http://www.b-panel.com/sustainable-building-indonesia/">b-panel<sup>&reg;</sup> Campus Seminar: Educating Young Generation to Support Sustainable Building Practices</a></li>
<li><a href="http://www.b-panel.com/little-pt-beton-elemenindo-putra-lessen-environmental-impact/">Little Things PT Beton Elemenindo Putra Does to Further Lessen Environmental Impact</a></li>
<li><a href="http://www.b-panel.com/b-panel-support-greenship-assessment-project-green-building-council-indonesia/">b-panel<sup>&reg;</sup> to support Greenship assessment for your project by the Green Building Council Indonesia</a></li>
<li><a href="http://www.b-panel.com/june-2012-reduction-in-carbon-emission-from-the-use-of-b-panel/">Reduction in carbon emission from the use of b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/june-2012-broader-environmental-consideration-in-b-panel-production-process/">Broader environmental consideration in b-panel<sup>&reg;</sup> production process</a></li>
<li><a href="http://www.b-panel.com/penghematan-biaya-air-conditioner/">Air Conditioner Cost Saving from Well-Insulated Dwelling</a></li>
<li><a href="Designing Energy-efficient Dwelling">Designing Energy-Efficient Dwelling</a></li>
<li><a href="http://www.b-panel.com/to-sell-eco-green-product/">To Sell Eco Green Product = Production Process Must be Green First</a></li>
<li><a href="http://www.b-panel.com/2009-11-innovative-building-material-for-green-construction-civil-engineer-seminar-at-tarumanegara-university-2009-b-panel%C2%AE-marketing-team/">Innovative Building Material for Green Construction</a></li>
<li><a href="http://www.b-panel.com/2009-06-ecogreen-building-with-b-panel%C2%AE-properti-biz-june-2009/">EcoGreen Building With b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2009-01-energy-efficient-housing-with-b-panel®/">Energy Efficient Housing with b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2008-06-save-energy-with-the-b-panel/">Save Energy with the b-panel<sup>&reg;</sup></a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>https://www.b-panel.com/april-2012-green-right-expo-2012/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>February 2012 &#124; Air Conditioner Cost Saving from Well-Insulated Dwelling</title>
		<link>https://www.b-panel.com/penghematan-biaya-air-conditioner/</link>
		<comments>https://www.b-panel.com/penghematan-biaya-air-conditioner/#comments</comments>
		<pubDate>Wed, 29 Feb 2012 02:57:36 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[Energy Efficient Building]]></category>
		<category><![CDATA[Environmentally Friendly Building]]></category>
		<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://www.b-panel.com/?p=1733</guid>
		<description><![CDATA[Abstract. Air conditioning is the largest electricity consumer in a house, so how to achieve maximum air quality healthy and comfortable with minimum air-conditioning energy consumption should be considered. Air conditioning energy efficiency can be achieved primarily from the design of the building. In this article the building uses b-panel®. b-panel® is a double layer [...]]]></description>
			<content:encoded><![CDATA[<p style="text-align:justify;clear:both;">
<b>Abstract</b>. Air conditioning is the largest electricity consumer in a house, so how to achieve maximum air quality healthy and comfortable with minimum air-conditioning energy consumption should be considered. Air conditioning energy efficiency can be achieved primarily from the design of the building. In this article the building uses  <font class="logo_b-panel_text">b-panel<sup>®</sup></font>. <font class="logo_b-panel_text">b-panel<sup>®</sup></font> is a double layer of reinforced concrete panel which is specially designed with a layer of expanded polystyrene insulation (EPS) in the middle. Figure 1 illustrates a house made of <font class="logo_b-panel_text">b-panel<sup>®</sup></font>.Factors that affect the cooling load in the room are the altitude, solar radiation, the orientation of the location of the building which affects the absorption of radiation, the color on the walls of buildings, and other supporting material quality (like the glass in the window). Therefore, the saving that occurs for the cooling load in the highlands (Bandung) and the coastal areas (Jakarta) will be different. This article presents the analysis of this difference.
</p>
<p style="text-align:center;"><img src="https://www.b-panel.com/wp-content/uploads/news/Penghematan-biaya-ac (1).jpg" ><br />
Figure 1 – House with <font class="logo_b-panel_text">b-panel<sup>®</sup></font> system</p>
<p>Indonesia is a humid tropical country. This conduces that many regions in Indonesia have to use air conditioning to obtain thermal comfort because it is not enough if the building uses only natural ventilation. Negative characteristics in humid tropical climate which cause unreliable natural ventilation for thermal comfort are:</p>
<ul>
<li>Highly dependent on climate and air quality. There is no clear time difference between rainy and dry season, it can even have overlapping.</li>
<li>The temperature is not easily predictable. Temperature in Indonesia is relatively high with little day-night amplitude (24<sup style="font-size:60%;">o</sup>C &#8211; 32<sup style="font-size:60%;">o</sup>C) and high solar radiation, which is greater than 900 W/m<sup style="font-size:60%;">2</sup>.</li>
<li>The wind speed is not easily predictable. Wind speed is low in the morning and evening, while the wind blows stronger at noon.</li>
<li>The humidity is not easily managed. High humidity (60% &#8211; 95%) causes the sweat does not evaporate, so the skin feels sticky and uncomfortable.</li>
<li>Others. Dusty air quality, odor, and pollution. In addition, there are presence of insects and environmental disturbances (e.g. noise) which are difficult to prevent.</li>
</ul>
<p>Therefore, in order to obtain thermal comfort in the room is to use artificial ventilation, such as air-conditioning (A / C). The advantages of using A/C are:</p>
<ul>
<li>The temperature was cooled and adjusted easily.
<li>The velocity and direction of air movement can be designed. (0,6 m/s < V < 1,5 m/s)
<li>
<li>The humidity can be lowered into the comfort zone(40% < Relative Humidity (RH)< 60%). The humidity in the wet tropics gives the largest contribution of thermal comfort.
<li>
<li>Cleanliness and health of air can be maintained with the filter and ionizer to kill bacteria, fungi, and others which can provide a fresh effect.
<li>
<li>Due to most of the use of A/C in a closed room, the side benefits are obtained, namely acoustic comfort andodor management.
<li>
</ul>
<p>However, there are some losses caused by the use of A/C. Among these are:</p>
<ul>
<li>Wasteful of energy. Electrical energy which is used achieves an average 40% of the total use of a dwelling.</li>
<li>The tendency of an enclosed space causes pollutant that accumulates inside, causing sick building syndrome. Therefore, artificial ventilation is required with adequate ACH (Air Change per Hour). (Source: Sistem Kelengkapan Bangunan, Ir. Paulus A.S., MT.)</li>
</ul>
<p style="text-align:justify;">The main task of the use of A/C is to carry the heat from the room to the outdoors. Therefore, the heat that comes into the room or that arises in the space should be as little as possible.One way to reduce the incoming heat is to use building materials that can withstand ambient temperature and solar load entering the room as much as possible (having a low transmittance value), such as using a expanded polystyrene(EPS) insulation. <font class="logo_b-panel_text">b-panel<sup>®</sup></font>&nbsp;is a double layer of reinforced concrete panel which is specially designed with a layer of EPS insulation (EPS) in the middle.The use of &nbsp;<font class="logo_b-panel_text">b-panel<sup>®</sup></font>&nbsp;in building can block the propagation of heat from the outdoor. This will impact positively to the reduction of energy consumption A/C, so that residents can save money on electricity cost.<br />
 Here is a diagram of the components of heat into the room and the heat generated in the room. These components are required to calculate the required cooling load in the room. Furthermore, it is used to determine the A/C model used with adequate cooling capacity of A/C.</p>
<p style="text-align:center;"><img src="https://www.b-panel.com/wp-content/uploads/news/Penghematan-biaya-ac (2) - eng.jpg" ><br />
Figure 2 – Heat components (Source:  <a href="http://www.egydown.com">www.egydown.com</a>)</p>
<p>In this article saving A/C which occurs if the <font class="logo_b-panel_text">b-panel<sup>®</sup></font> is used as a building material in the highland (Bandung) and the coastal area (Jakarta) will be discussed. Here are data from the city of Bandung thermal comfort:</p>
<ul>
<li>The afternoon temperature is 28<sup style="font-size:60%;">o</sup>C–29<sup style="font-size:60%;">o</sup>C. Even in Tegallega and Gedebage heat island has been formed with a minimum temperature of 27<sup style="font-size:60%;">o</sup>C. Afternoon temperaturein a state of extreme reaches more than 30<sup style="font-size:60%;">o</sup>C. Nighttime temperature is 16<sup style="font-size:60%;">o</sup>C–19<sup style="font-size:60%;">o</sup>C. Thus, the daytime temperature has exceeded the threshold of comfort 26<sup style="font-size:60%;">o</sup>C.</li>
<li>Relative humidity (RH) which is 80%-90% has exceeded the threshold of comfort 60%.</li>
<li>Wind speed and direction are uncertain. In an open environment wind speedcan reach 2–4 m/s (Source: Sistem Kelengkapan Bangunan, Ir. Paulus A.S., MT.)</li>
</ul>
<p>Here are the thermal comfort fatcs of Jakarta:</p>
<ul>
<li>The average afternoon temperature in 2010 is between31,3<sup style="font-size:60%;">o</sup>C–34,3<sup style="font-size:60%;">o</sup>C.The average night time temperature is between 24,2<sup style="font-size:60%;">o</sup>C–25,5<sup style="font-size:60%;">o</sup>C (Source:World Meteorological Organization).</li>
<li>In 2005 the average RH in the dry season is 60%-85%, whereas the average RH in wet season is 79%-88%.</li>
<li>In 2005 the wind speed in the dry season reaches 0.2 to 0.8 m/s, while the wind speed in the wet season is from 0.6 to 1.6 m/s. Wind leads to the south and southeast. (Source: Studi Ekologi Kualitas Udara di Jakarta, Tangerang, dan Bogor)</li>
</ul>
<p style="text-align:justify;">For ease of analysis, the limits of the room to calculate the cooling load will be made. Cooling load is calculated for each building using <font class="logo_b-panel_text">b-panel<sup>®</sup></font> and red brick in Jakarta and Bandung.There is a house with a length = 8 m, width = 8 m, and height = 3.2 m with 4 room where three rooms is fitted with A/C and 1 room is not is fitted with A/C. All rooms are identical and have a window (see Figure 3 and Figure 4).</p>
<p style="text-align:center;"><img src="https://www.b-panel.com/wp-content/uploads/news/Penghematan-biaya-ac (3) - eng.jpg" ><br />
Figure 3 – House front view</p>
<p style="text-align:center;"><img src="https://www.b-panel.com/wp-content/uploads/news/Penghematan-biaya-ac (4).jpg" ><br />
Figure 4 – House plan</p>
<p style="text-align:justify;">Wall have a thickness of 15 cm. Each room has two walls in direct contact with the outside air. Room A and room C has a wall associated with the air in the room without A/C, while the B room has 2 walls associated with the air in the room is fitted with A / C (which means no thermal flow). This house uses roof deck. Two types of wall are analyzed:</p>
<ol>
<li>Wall made of traditional brick, 11 cm thickness, plastered and finished both surfaces, each thickness is 2cm(U<span style="font-size:60%;">wall</span> = 2,55 W/m<sup style="font-size:60%;">2</sup> C, <span style="font-size:16px;">&alpha;</span><span style="font-size:60%;">wall</span> = 0,89). Table of value of the absorption of solar radiation to the outer walls and an opaque roof (a) are indicated in Table 1:</li>
<li>Walls made of reinforced concrete which center is filled the center with expanded polystyrene (EPS) is known as the <font class="logo_b-panel_text">b-panel<sup>®</sup></font>. Regarded as lightweight concrete walls. EPS is 9 cm thick and the thickness of concrete to each side is 3 cm (U<span style="font-size:60%;">wall</span> = 0,4 W/m<sup style="font-size:60%;">2</sup> C, <span style="font-size:16px;">&alpha;</span><span style="font-size:60%;">wall</span> = 0,86).</li>
</ol>
<p style="text-align:center;">
Table 1 – Absorption of solar radiation values for external walls and opaque roofa<br />
(sumber: <a href="http://www.jurnalinsinyurmesin.com">www.jurnalinsinyurmesin.com</a>)<br />
<img src="https://www.b-panel.com/wp-content/uploads/news/Penghematan-biaya-ac (5).jpg" >
</p>
<p>Outer walls and roof deck were painted with medium yellow color <span style="font-size:16px;">&alpha;</span><span style="font-size:60%;">paint</span> = 0,58. If the outside walls were painted with different color, it will give the different absorption of solar radiation value (&alpha;), as shown in Table 2 below:</p>
<p style="text-align:center;">
Table 2 – Absorption of solar radiation values for the paint on the surface of the outer wall<br />
(Source : <a href="http://www.jurnalinsinyurmesin.com">www.jurnalinsinyurmesin.com</a>)<br />
<img src="https://www.b-panel.com/wp-content/uploads/news/Penghematan-biaya-ac (6).jpg" >
</p>
<p>On the walls glass windows were fitted with the glass length = 0.9 m and the glass height = 1.5 m (U<span style="font-size:60%;">glass</span> = 4,48 W/m<sup style="font-size:60%;">2</sup> <sup style="font-size:60%;">o</sup>C, from the factory brochure). The average incidence angle of the sun coming through the walls and windows are assumed ß = 75<sup style="font-size:60%;">o</sup> and the window has a &Phi; = 0.75.<br />
  These other data along with a brief explanation are required for cooling load calculation if the building is planned in two different cities, namely Jakarta and Bandung:</p>
<ol>
<li><b>Solar radiation</b>. Solar radiation is radiant energy derived from thermonuclear processes occurring in the sun. Solar radiation energy is in the form of light and electromagnetic wave. The spectrum of solar radiation itself consists of two, namely, short-wave ray and long-wave ray. This includes short-wave rays are x-ray, gamma ray, ultraviolet ray, while the long-wave ray is infrared ray. The total amount of radiation received at the earth&#8217;s surface depends on four factors:</li>
<ul>
<li>The distance of the sun. Any change in the distance of the earth and the sun cause variations in the acceptance of solar energy.</li>
<li>The intensity of solar radiation is the size of the angle of incidence of sunlight on the earth&#8217;s surface. The amount received is directly proportional to the magnitude of the angle of incidence angle.Ray with an oblique incidence angle gives less energy in the earth&#8217;s surface caused by the energy spread on the surface area and also because the ray has to travel a further layer of the atmosphere than if the light with a perpendicular angle.</li>
<li>Sun duration is the distance and duration between sunrise and sunset. Due to the fact that Bandung and Jakarta are located in the southern hemisphere, and then the length of the day will be greater at the end of the year (December/January) compared to the middle of the year (June/July).</li>
<li>Influence of the atmosphere. Rays through the atmosphere will be partially absorbed by gases, dust, and water vapor, reflected back, emitted, and the remainder forwarded to the earth&#8217;s surface.(Source:  <a href="http://www.wikipedia.com">www.wikipedia.com</a>)</li>
</ul>
</ul>
<p>The following is a table of data measurement result of solar radiation intensity across Indonesia by BPPT and BMKG from 1965 to 1995.</p>
<p style="text-align:center;">
Table 3 – The intensity of solar radiation in Indonesia<br />
<img src="https://www.b-panel.com/wp-content/uploads/news/Penghematan-biaya-ac (7).jpg" ><br />
Source: ‘Analisis Potensi Pembangkit Listrik Tenaga Surya di Indonesia’<br />
By Irawan Rahardjo and Ira Fitriana
</p>
<p>Known average solar radiation = I = 1000 W/m<sup style="font-size:60%;">2</sup>. This is the average solar radiation power in Indonesia.</p>
<ol start="2">
<li><b>Outer Air Layer Transmittance</b>. f<sub style="font-size:60%;">o</sub>= 20  W/m<sup style="font-size:60%;">2</sup> <sup style="font-size:60%;">o</sup>C</li>
<li><b>Air Change Hour (ACH)</b>.  ACH is the number of how many times the change of air in a certain space (usually in the room or house).Change of the air in a confined space is very important for several reasons, mainly because we need fresh air to live.Without the exchange of fresh air, the moisture will be trapped in a building, mold and allergens can grow, as well excessively hazardous gases (such as carbon monoxide, carbon dioxide, and urea-formaldehyde) can remain in the house.The stale air is not good for health. Because humans and animals receive that air into the body when breathing, sweating, washing, bathing or drying, we need ventilation to increase the number of air changes in the home with fresh outdoor air.With the new focus on energy efficiency to reduce carbon and reduce dependence on fossil fuels, consumers are trying to seal their homes from the transfer of air in and out in the winter and summer.The importance of fresh air intake cannot be ruled out. Air exchange does not represent the process of exchanging all air in the room or structure unless it can be considered as plug flow.The actual percentage of indoor air having been exchanged in a given period depends on the efficiency of air flow from the room and what methods are used in that ventilation process. The actual amount of air exchange in a well ventilated scenario is 63.2% after 1 hour and 1 ACH. To achieve an appropriate balance of pressure, the amount of air in and out of the surface should be the same.</li>
</ul>
<p style="text-align:center;">
Table 4 – Air change rate<br />
(Source: <a href="http://www.wikipedia.com">www.wikipedia.com</a>)<br />
<img src="https://www.b-panel.com/wp-content/uploads/news/Penghematan-biaya-ac (8).jpg" >
</p>
<p>Ventilation = 3 ACH (Air Change Hour)</p>
<ol start="4">
<li>Temperature in the room mounted A/C is conditioned = T<sub style="font-size:60%;">1</sub> = 20<sup style="font-size:60%;">o</sup>C (in a state of balance, there is no heat flow in the dividing wall with another room).</li>
<li>Here are the Bandung and Jakarta climate datameasured by BMKG on 5 Januari 2012.</li>
</ol>
<p style="text-align:center;">
Table 5 – Climate data in Bandung (Source: <a href="http://www.bmkg.co.id">www.bmkg.co.id</a>)<br />
<img src="https://www.b-panel.com/wp-content/uploads/news/Penghematan-biaya-ac (9).jpg" >
</p>
<p style="text-align:center;">
Table 6 – Climate data in Jakarta (Source: <a href="http://www.bmkg.co.id">www.bmkg.co.id</a>)<br />
<img src="https://www.b-panel.com/wp-content/uploads/news/Penghematan-biaya-ac (10).jpg" >
</p>
<ol start="6">
<li>6.	Each room contains a single occupant, and uses two CFL (Compact Fluorescent Lamp) with the power of 11 Watt. Each person releases 140 Watt of heat.</li>
</ol>
<p>The following is analysis of cooling load calculation that are required in both places. Calculation is derived from the dictates of Buildings Completed Systems Subjects prepared by Ir. Paulus A. S., MT. The figure below shows that heat into the room.</p>
<p style="text-align:center;">
<img src="https://www.b-panel.com/wp-content/uploads/news/Penghematan-biaya-ac (11) - eng.jpg" ><br />
Figure 5 – Diagram of source of heat into the room
</p>
<p><b>Cooling load calculation of the red-brick building in the coastal area (Jakarta):</b><br />
  The formula used is <b>Q<span style="font-size:60%;">m</span> = Q<span style="font-size:60%;">i</span> + Q<span style="font-size:60%;">s</span> + Q<span style="font-size:60%;">c</span> + Q<span style="font-size:60%;">v</span> </b>. . Heat that need to transfer: heat inside room + solar heat penetrated glass/window + heat outside penetrated wall + heat from outside. Here are the calculations for room A and room C.<br />
  Calculate first &Delta;<span style="font-size:60%;">glass</span> and &Delta;<span style="font-size:60%;">dinding</span> :</p>
<div style="float:left">
  &Delta; T<span style="font-size:60%;">glass</span>
  </div>
<div style="float:left;padding-left:10px;">
  = T<sub style="font-size:60%;">0</sub> – T<sub style="font-size:60%;">1</sub> <br />
  = 28,5<sup style="font-size:60%;">0</sup>C – 20<sup style="font-size:60%;">0</sup>C<br />
  = 8,5<sup style="font-size:60%;">0</sup>C
  </div>
</p>
<div style="clear:both"></div>
<p>&Delta; T<span style="font-size:60%;">wall</span>  by calculating the average absorption of plastered and coated brick:</p>
<div style="float:left">a</div>
<div style="float:left;padding-left:10px;">
= 0,5 (&alpha;<span style="font-size:60%;">wall</span>  + &alpha;<span style="font-size:60%;">paint</span>)<br />
= 0,5 (0,89 + 0,58)<br />
= 0,735
</div>
<div style="clear:both"></div>
<p>
Wall surface temperature outside</p>
<div style="float:left">T<sub style="font-size:60%;">s</sub>   </div>
<div style="float:left;padding-left:10px;">
=  T<sub style="font-size:60%;">0</sub>+ (I.a.cosß/f<sub style="font-size:60%;">0</sub>)<br />
= 28,5  + (1000)(0,735)(cos75/20)<br />
= 38,01<sup style="font-size:60%;">0</sup>C
</div>
<div style="clear:both;"></div>
<p>  Thus &Delta; T<span style="font-size:60%;">dinding</span> = 38,01 – 20 = 18,01<sup style="font-size:60%;">0</sup>C</p>
<p>  Cooling Load: </p>
<div style="float:left;">Q<span style="font-size:60%;">i</span> </div>
<div style="float:left;padding-left:10px;">
  = total heat (humans and equipment)<br />
  = lamp heat + human heat<br />
  = (2)(11) + (1)(140)<br />
  = 162 W
  </div>
</p>
<div style="clear:both;"></div>
<p><div style="float:left;">Q<span style="font-size:60%;">s</span> </div>
<div style="float:left;padding-left:10px;">
  = solar heat that penetrated the glass<br />
  = &alpha;<span style="font-size:60%;">glass</span> .I . ?<br />
  = (0,9)(1,5)(1000)(0,75)<br />
  = 1012,5 W
</div>
<div style="clear:both"></div>
<p></p>
<div style="float:left;">Q<span style="font-size:60%;">c</span> </div>
<div style="float:left;padding-left:10px;">
= heat through the wall and roof deck + heat through the glass<br />
= <span style="font-size:16px;">&alpha;</span><span style="font-size:60%;">wall</span> .U<span style="font-size:60%;">wall</span>  . &Delta;T<span style="font-size:60%;">wall</span> + &alpha;<span style="font-size:60%;">glass</span> .U<span style="font-size:60%;">glass</span>.&Delta;T<span style="font-size:60%;">glass</span><br />
  = [(2 x 4 x 3,2 – 1,5 x 0,9 + 4 x 4)(2,55)(38,01 - 20) + (4 x 3,2)(2,55)(26 -  20)] + (1,5 x 0,9)(4,48)(28,5 &#8211; 20)<br />
  = 2095,91 W
</div>
</p>
<div style="clear:both;"></div>
<p>
<div style="float:left;"> Q<span style="font-size:60%;">v</span><br />V </div>
<div style="float:left;padding-left:10px;">
  = heat due to ventilation <br />
  = (space volume) x (ACH)/3600 seconds<br />
  = (4 x 4 x 3,2) x (3)/3600<br />
  =  0,0427<br />
  = 1300.V. &Delta;T<br />
  =  (1300)(0,0427)(28,5-20)<br />
  =  471,84 W
</div>
</p>
<div style="clear:both;"></div>
<p>Q<span style="font-size:60%;">m</span>= 162 + 2095,91 + 471,84 = 3742,25 W. Thus, the heat that must be transported out of the room A and room C is respectively 3742,25 W. In the same way, the required cooling load to room B is:<br />
  Q<span style="font-size:60%;">i</span> = 162 W<br />
  Q<span style="font-size:60%;">s</span> = 1012,5          W<br />
  Q<span style="font-size:60%;">c</span> = 1900,07 W<br />
  Q<span style="font-size:60%;">v</span> = 471,84 W<br />
  Q<span style="font-size:60%;">m</span> = 162 + 1012,5  + 1900,07 + 471,84 = 3546,41 W. The heat that must be transported out of the room B is 3,55 kW. Thus, the cooling load required for this house is = 3742,25 W + 3742,25 W + 3546,41 W = 11030,91 W = 11,03 kW.</p>
<p><b>Cooling load calculation of the <font class="logo_b-panel_text">b-panel<sup>®</sup></font>&nbsp;®  building in the coastal area (Jakarta):</b><br />
  Here is the calculation for room A and room C:<br />
  Q<span style="font-size:60%;">i</span> = 162 W<br />
  Q<span style="font-size:60%;">s</span> = 1012,5          W<br />
  Q<span style="font-size:60%;">c</span> = 368,99 W<br />
  Q<span style="font-size:60%;">v</span> = 471,84 W<br />
  Q<span style="font-size:60%;">m</span> = 162 + 1012,5  + 368,99 + 471,84 = 2015,33 W. Thus, the heat that must be transported out of the room A and room C is respectively 2015,33 W. In the same way, the required cooling load to room B is:<br />
  Q<span style="font-size:60%;">i</span> = 162 W<br />
  Q<span style="font-size:60%;">s</span> = 1012,5          W<br />
  Q<span style="font-size:60%;">c</span> = 338,27 W<br />
  Q<span style="font-size:60%;">v</span> = 471,84 W<br />
  Q<span style="font-size:60%;">m</span> = 162 + 1012,5  + 338,27 + 471,84 = 1984,61 W. The heat thatmust be transported out of the room B is 1984,61 W. Thus, the cooling load required for this house is = 2015,33 W + 2015,33 W + 1984,61 W = 6015,27 W = 6,02 kW.</p>
<p><b>Cooling load calculation of the red-brick building in the highland (Bandung):</b><br />
  Here is the calculation for room A and room C:<br />
  Q<span style="font-size:60%;">i</span> = 162 W<br />
  Q<span style="font-size:60%;">s</span> = 1012,5          W<br />
  Q<span style="font-size:60%;">c</span> = 1530,61 W<br />
  Q<span style="font-size:60%;">v</span> = 249,80 W<br />
  Q<span style="font-size:60%;">m</span> = 162 + 1012,5  + 1530,61 + 249,80 = 2954,91 W. Thus, the heat that must be transported out of the room A and room C is respectively 2954,91 W. In the same way, the required cooling load to room B is:<br />
  Q<span style="font-size:60%;">i</span> = 162 W<br />
  Q<span style="font-size:60%;">s</span> = 1012,5          W<br />
  Q<span style="font-size:60%;">c</span> = 1465,33 W<br />
  Q<span style="font-size:60%;">v</span> = 249,80 W<br />
  Q<span style="font-size:60%;">m</span> = 162 + 1012,5  + 1465,33 + 249,80 = 2889,63 W.The heat thatmust be transported out of the room B is 2889,63 W. Thus, the cooling load required for this house is = 2954,91 W + 2954,91 W + 2889,63 W = 8799,45 W = 8,80 kW.</p>
<p><b>Cooling load calculation of the <font class="logo_b-panel_text">b-panel<sup>®</sup></font>&nbsp;building in the highland (Bandung):</b><br />
  Here is the calculation for room A and room C:<br />
  Q<span style="font-size:60%;">i</span> = 162 W<br />
  Q<span style="font-size:60%;">s</span> = 1012,5          W<br />
  Q<span style="font-size:60%;">c</span> = 259,92 W<br />
  Q<span style="font-size:60%;">v</span> = 249,80 W<br />
  Q<span style="font-size:60%;">m</span> = 162 + 1012,5  + 259,92 + 249,80 = 1684,22 W. Thus, the heat that must be transported out of the room A and room C is respectively 1684,22 W. In the same way, the required cooling load to room B is:<br />
  Q<span style="font-size:60%;">i</span> = 162 W<br />
  Q<span style="font-size:60%;">s</span> = 1012,5          W<br />
  Q<span style="font-size:60%;">c</span> = 249,68 W<br />
  Q<span style="font-size:60%;">v</span> = 249,80 W<br />
  Q<span style="font-size:60%;">m</span> = 162 + 1012,5  + 249,68 + 249,80 = 1673,98 W. The heat thatmust be transported out of the room B is 1673,98 W. Thus, the cooling load required for this house is = 1684,22 W + 1684,22 W + 1673,98 W = 5042,42 = 5,04 kW.</p>
<p style="text-align:center;">Table 7 – Required cooling load</p>
<p><img src="https://www.b-panel.com/wp-content/uploads/news/Penghematan-biaya-ac (14).JPG" width="600" ></p>
<p>By using the <font class="logo_b-panel_text">b-panel<sup>®</sup></font>cooling load can be reduced by 45,5% in Jakarta and by 42,7% in Bandung to the building with red brick. Below is a comparison chart of the required cooling load between Bandung and Jakarta.</p>
<p style="text-align:center;">
<img src="https://www.b-panel.com/wp-content/uploads/news/Penghematan-biaya-ac (13) - eng.jpg" ><br />
Figure 6 – Cooling load chart in Bandung and Jakarta
</p>
<p>Conclusion. The use of <font class="logo_b-panel_text">b-panel<sup>®</sup></font> consistently and significantly lowers cooling load more than 40% in both coastal areas (Jakarta) and the highlands (Bandung). The average temperature differences in the two cities cause different A/C load. However, drastic improvement of A/C power consumption occurs when the entire surfaces of the walls and roof deck in direct contact with the outside wrapped with a layer of insulation, such as the presence of EPS in the <font class="logo_b-panel_text">b-panel<sup>®</sup></font> system.</p>
<p>
<strong>Related News:</strong></p>
<ul>
<li><a href="http://www.b-panel.com/sustainable-building-indonesia/">b-panel<sup>&reg;</sup> Campus Seminar: Educating Young Generation to Support Sustainable Building Practices</a></li>
<li><a href="http://www.b-panel.com/little-pt-beton-elemenindo-putra-lessen-environmental-impact/">Little Things PT Beton Elemenindo Putra Does to Further Lessen Environmental Impact</a></li>
<li><a href="http://www.b-panel.com/b-panel-support-greenship-assessment-project-green-building-council-indonesia/">b-panel<sup>&reg;</sup> to support Greenship assessment for your project by the Green Building Council Indonesia</a></li>
<li><a href="http://www.b-panel.com/june-2012-reduction-in-carbon-emission-from-the-use-of-b-panel/">Reduction in carbon emission from the use of b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/june-2012-broader-environmental-consideration-in-b-panel-production-process/">Broader environmental consideration in b-panel<sup>&reg;</sup> production process</a></li>
<li><a href="http://www.b-panel.com/april-2012-green-right-expo-2012/">Green Right Expo 2012</a></li>
<li><a href="Designing Energy-efficient Dwelling">Designing Energy-Efficient Dwelling</a></li>
<li><a href="http://www.b-panel.com/to-sell-eco-green-product/">To Sell Eco Green Product = Production Process Must be Green First</a></li>
<li><a href="http://www.b-panel.com/2009-11-innovative-building-material-for-green-construction-civil-engineer-seminar-at-tarumanegara-university-2009-b-panel%C2%AE-marketing-team/">Innovative Building Material for Green Construction</a></li>
<li><a href="http://www.b-panel.com/2009-06-ecogreen-building-with-b-panel%C2%AE-properti-biz-june-2009/">EcoGreen Building With b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2009-01-energy-efficient-housing-with-b-panel®/">Energy Efficient Housing with b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2008-06-save-energy-with-the-b-panel/">Save Energy with the b-panel<sup>&reg;</sup></a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>https://www.b-panel.com/penghematan-biaya-air-conditioner/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>November 2011 &#124; Designing Energy-efficient Dwelling</title>
		<link>https://www.b-panel.com/2011-11-designing-energy-efficient-dwelling/</link>
		<comments>https://www.b-panel.com/2011-11-designing-energy-efficient-dwelling/#comments</comments>
		<pubDate>Sun, 06 Nov 2011 03:42:03 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[Energy Efficient Building]]></category>
		<category><![CDATA[Environmentally Friendly Building]]></category>
		<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://localhost/new_b-panel_3/?p=1127</guid>
		<description><![CDATA[DESIGNING ENERGY-EFFICIENT DWELLING Teks Dewi Kartini, Images Ricardo de Melo Design Dicky Aryoaditomo, Owner Lukman Masputra, BSD, Tangerang The living room is adjacent to the foyer which is coded by the placement of the console. The wall covered by floral wallpapers becomes the focal point of this beautiful room. The space is fairly cool on [...]]]></description>
			<content:encoded><![CDATA[<table width="680" border="0" cellspacing="0" cellpadding="0" style="font-size:14px">
<tr>
<td colspan="2">
<h1 align="center" style="font-size:22px"><font style="font-weight:bold">DESIGNING ENERGY-EFFICIENT DWELLING</font></h1>
<p></p>
<p align="center">Teks <font style="font-weight:bold">Dewi Kartini</font>, Images <font style="font-weight:bold">Ricardo de Melo</font><br />
	  Design <font style="font-weight:bold">Dicky Aryoaditomo</font>, Owner <font style="font-weight:bold">Lukman  Masputra, BSD, Tangerang</font></p>
<p>
    </td>
</tr>
<tr>
<td colspan="2" align="center"><img src="https://www.b-panel.com/wp-content/uploads/news/article-2011-merancang-ruang-hemat-energi-1.jpg" width="398" height="511"></td>
</tr>
<tr>
<td colspan="2" style="clear:both">
<ul>
<li>The living room is adjacent to the foyer  which is coded by the placement of the console. The wall covered by floral wallpapers becomes  the focal point of this beautiful room.</li>
<li>The space is fairly cool on a sweltering afternoon due to walls, floors, and roofs using a expanded polystyrene (EPS)-lined concrete panel system.</li>
</ul>
<p>
    </td>
</tr>
<tr>
<td colspan="2"></td>
</tr>
<tr>
<td colspan="2">
    <img width="440px" src="https://www.b-panel.com/wp-content/uploads/news/article-2011-merancang-ruang-hemat-energi-2.jpg">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<img width="150px" src="https://www.b-panel.com/wp-content/uploads/news/article-2011-merancang-ruang-hemat-energi-3.jpg">
</td>
</tr>
<tr>
<td width="50%">
    The main principle of this house is to strive for the weather in the house not getting hot and to save on electricity cost. The building is designed with a lot of openings for good cross ventilation occurred. As a result, the air becomes cool and the room gets sufficient natural lighting.<br />
	<br />
    The concept was supported by the use of material that is &#8220;friendly&#8221; with heat. Almost all building elements, ranging from walls, floors, roofs, stairs, pergola, to septic tanks, using EPS (Expanded Polystyrene) insulation which can reduce the heat from the outside of buildings up to 93%. Eventually, without using air conditioner, the room is fairly cool.<br />
	<br />
    Energy-saving concept that brings into this building makes the house more environmentally friendly.
    </td>
<td width="50%" align="center" valign="top"><img width="350px;" src="https://www.b-panel.com/wp-content/uploads/news/article-2011-merancang-ruang-hemat-energi-4.jpg"></p>
<ul style="text-align:left;">
<li>The bedroom which floor is made of wood is fitted with solid wooden furniture. Window frames are colored matching with the color of furnitures.</li>
<li>The accents of the room are the mattress and fresh floral  pillow covers.</li>
</ul>
</td>
</tr>
<tr>
<td>&nbsp;</td>
<td>&nbsp;</td>
</tr>
<tr>
<td height="179">
<p><font style="font-weight:bold;font-size:18px;">Why is the used of EPS?</font><br />
      This five-story house stands on 250m<sup>2</sup> of land with a building area of 750m2. Architect, Dicky Aryoaditomo and homeowner, Lukman Masputra, agreed to use EPS insulated concrete  by considering a number of advantages.<br />
	  <br />
      Polystyrene is a thermal insulation which reduces heat up to 93%, and be able to dampen the sound (sound proof). The material is lightweight; 130kg/m<sup>2</sup> for wall thickness of 15cm. Lightweight structures can avoid severe damage during the earthquake, so that the buildings become more earthquake-resistant. Buildings that use this material are also more resistant to fire, moisture, and can be rapidly installed.
	  </p>
</td>
<td rowspan="2" align="center"><img width="350px" src="https://www.b-panel.com/wp-content/uploads/news/article-2011-merancang-ruang-hemat-energi-6.jpg"></td>
</tr>
<tr>
<td align="center" valign="top"><img width="250px" src="https://www.b-panel.com/wp-content/uploads/news/article-2011-merancang-ruang-hemat-energi-5.jpg"></td>
</tr>
<tr>
<td>
<ul>
<li>All windows and doors are equipped with two covers. The first cover are wooden doors and windows, while the second cover is the mosquito net.</li>
<li>All windows and doors can be opened and flow air into the house, but the mosquitoes/insects can not enter. The process of cooling room is maximized.</li>
</ul>
</td>
<td width="50%" valign="top">
<ul>
<li>Almost all building elements, ranging from floors, walls, roofs, ceilings, pergola, to septic tanks, using EPS-lined concrete as the main material.</li>
<li>The building becomes cooler because polystyrene reduce heat up to 93%.</li>
</ul>
</td>
</tr>
<tr>
<td colspan="2">
<p><font style="font-weight:bold;font-size:18px;">Preparation and EPS Panels Application</font><br />
      There are several companies that produce this type of polystyrene. The price varies, depending on thickness, and relatively more expensive than the brick with a mixture of cement and sand. The price is 10% -15% more expensive compared to bricks, but the benefits are numerous.<br />
	  <br />
      How are its preparation and application to build a house? The steps are :</p>
<ol>
<li>Architect submits the design drawings to the factory. For example, the wall, floor, and roof drawings.</li>
<li>The factory produces or forms polystyrene materials according to design drawings.</li>
<li>Materials that have been prepared are delivered to the site.</li>
</ol>
</td>
</tr>
<tr>
<td>
<ol start="4">
<li>Materials are developed and applied in accordance with the design. Each piece of material is coded for ease of placement during setup.</li>
<li>Polystyrene materials are prepared with wiremesh as a reinforcement, and then filled with cement and plastered by spraying with concrete to cover the wiremesh.</li>
<li>After the plaster dries, the second plastering is done again, until the desired thickness is achieved.</li>
<li>The final step is the process of refining the materials (finishing).</li>
</ol>
</td>
<td align="center"><img width="350px;" src="https://www.b-panel.com/wp-content/uploads/news/article-2011-merancang-ruang-hemat-energi-7.jpg"></td>
</tr>
<tr>
<td colspan="2"><font style="font-weight:bold">Note : Make sure the design is appropriate when it is given to factory. It would be very inconvenient if the design changes after the materials are produced completely.</font></td>
</tr>
<tr>
<td colspan="2">&nbsp;</td>
</tr>
<tr>
<td colspan="2">Source: <b>Idea Magazine</b></td>
</tr>
<tr>
<td colspan="2">&nbsp;</td>
</tr>
</table>
<p>
<strong>Related News:</strong></p>
<ul>
<li><a href="http://www.b-panel.com/sustainable-building-indonesia/">b-panel<sup>&reg;</sup> Campus Seminar: Educating Young Generation to Support Sustainable Building Practices</a></li>
<li><a href="http://www.b-panel.com/little-pt-beton-elemenindo-putra-lessen-environmental-impact/">Little Things PT Beton Elemenindo Putra Does to Further Lessen Environmental Impact</a></li>
<li><a href="http://www.b-panel.com/b-panel-support-greenship-assessment-project-green-building-council-indonesia/">b-panel<sup>&reg;</sup> to support Greenship assessment for your project by the Green Building Council Indonesia</a></li>
<li><a href="http://www.b-panel.com/june-2012-reduction-in-carbon-emission-from-the-use-of-b-panel/">Reduction in carbon emission from the use of b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/june-2012-broader-environmental-consideration-in-b-panel-production-process/">Broader environmental consideration in b-panel<sup>&reg;</sup> production process</a></li>
<li><a href="http://www.b-panel.com/april-2012-green-right-expo-2012/">Green Right Expo 2012</a></li>
<li><a href="http://www.b-panel.com/penghematan-biaya-air-conditioner/">Air Conditioner Cost Saving from Well-Insulated Dwelling</a></li>
<li><a href="http://www.b-panel.com/to-sell-eco-green-product/">To Sell Eco Green Product = Production Process Must be Green First</a></li>
<li><a href="http://www.b-panel.com/2009-11-innovative-building-material-for-green-construction-civil-engineer-seminar-at-tarumanegara-university-2009-b-panel%C2%AE-marketing-team/">Innovative Building Material for Green Construction</a></li>
<li><a href="http://www.b-panel.com/2009-06-ecogreen-building-with-b-panel%C2%AE-properti-biz-june-2009/">EcoGreen Building With b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2009-01-energy-efficient-housing-with-b-panel®/">Energy Efficient Housing with b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2008-06-save-energy-with-the-b-panel/">Save Energy with the b-panel<sup>&reg;</sup></a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>https://www.b-panel.com/2011-11-designing-energy-efficient-dwelling/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>June 2009 &#124; EcoGreen Building With b-panel</title>
		<link>https://www.b-panel.com/2009-06-ecogreen-building-with-b-panel%c2%ae-properti-biz-june-2009/</link>
		<comments>https://www.b-panel.com/2009-06-ecogreen-building-with-b-panel%c2%ae-properti-biz-june-2009/#comments</comments>
		<pubDate>Sun, 14 Jun 2009 22:00:07 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[Environmentally Friendly Building]]></category>
		<category><![CDATA[Green Building]]></category>
		<category><![CDATA[News]]></category>

		<guid isPermaLink="false">http://localhost/new_b-panel_3/?p=86</guid>
		<description><![CDATA[Eco Green Building with b-panel® Global warming a problem that must be addressed. Therefore, if you want to build an Eco Green Buiilding, b-panel® is a good step. There are several elements that make b-panel® eco green, including: - Reduce Energy Consumption and Harmful Emissions b-panel® is a combination of insulating ability of expanded polystyrene [...]]]></description>
			<content:encoded><![CDATA[<div style="clear:both;"></div>
<p></p>
<p style="text-align: center; font-size: 20px;">Eco Green Building with <strong><span class="logo_b-panel_text">b-panel<sup class="logo_reg_text">®</sup></span></strong></p>
<p align="justify"><span id="result_box" lang="en"><span>Global warming a problem that must be addressed. </span><span>Therefore, if you want to build an Eco Green Buiilding, </span></span><strong><span class="logo_b-panel_text">b-panel<sup class="logo_reg_text">®</sup></span></strong><span id="result_box" lang="en"><span> is a good step.</span></span></p>
<p><span>There are several elements that make </span><strong><span class="logo_b-panel_text">b-panel<sup class="logo_reg_text">®</sup></span></strong><span id="result_box" lang="en"><span> eco green, including:</span></span></p>
<p><span>- Reduce Energy Consumption and Harmful Emissions<br />
</span><strong><span class="logo_b-panel_text">b-panel<sup class="logo_reg_text">®</sup></span></strong><span id="result_box" lang="en"><span> is a combination of insulating ability of expanded polystyrene (EPS) and mass concrete. </span><span>It is a combination of materials that can produce a structure that has a high level of thermal insulation. </span>With a high thermal insulation it will reduce down rising temperatures in the room, so as to reduce the energy consumption of the device used to heat or cool the room.</span></p>
<p><span id="result_box" lang="en"><span>Furthermore, in the manufacture of </span></span><strong><span class="logo_b-panel_text">b-panel<sup class="logo_reg_text">®</sup></span></strong><span id="result_box" lang="en"><span> uses steam and cold water to produce EPS. </span><span>No toxic substances, such as formaldehyde or other chemicals used in the production process </span></span><strong><span class="logo_b-panel_text">b-panel<sup class="logo_reg_text">®</sup></span></strong><span id="result_box" lang="en"><span>, and no emissions of greenhouse gases produced, such as chlorofluorocarbons (CFCs) or HydroChloroFluoroCarbon (HCFCs), so that in the manufacturing process,</span></span><strong><span class="logo_b-panel_text">b-panel<sup class="logo_reg_text">®</sup></span></strong><span id="result_box" lang="en"><span> is also eco green.</span></span></p>
<p align="center"><img src="http://bpanel.files.wordpress.com/2009/06/single_panel.jpg?w=400&amp;h=300" alt="b-panel" border="0" /></p>
<p align="justify"><span id="result_box" lang="en"><span>- Reduce the Use of Wood.</span></span></p>
<p><span>For conventional buildings, the use of wood very much (especially for the manufacture of formwork columns, beams, and concrete floor). </span><span>While using the </span><strong><span class="logo_b-panel_text">b-panel<sup class="logo_reg_text">®</sup></span></strong><span id="result_box" lang="en"><span>, wood is used only for &#8220;Stood&#8221; only with smaller amounts and can also be replaced by using the iron box is empty / hollow so that the use of wood can be eliminated. </span><span>That is, the use of </span></span><strong><span class="logo_b-panel_text">b-panel<sup class="logo_reg_text">®</sup></span></strong><span id="result_box" lang="en"><span> can reduce the number of trees felled for the construction industry.</span></span></p>
<p align="center"><img src="http://bpanel.files.wordpress.com/2009/06/de_latinos.jpg?w=400&amp;h=300" alt="Rumah dengan b-panel" border="0" /></p>
<p style="text-align: justify;"><span id="result_box" class="long_text" lang="en"><span>- Reduce the Destruction of the Environment by Reducing the Consumption of Natural Materials</span></span></p>
<p><span>In making the wall of a building generally uses brick (red brick and con can block) as the main material. </span><span>Then do the plaster work to tidy up the masonry.</span></p>
<p><span>In the manufacture of red brick, the material used is clay. </span><span>For the amount of usage that a lot of red brick, it would be too much clay used in its production. </span><span>While we know that the excavation of clay is an activity that can damage the environment and worsen soil erosion.</span></p>
<p><span>Meanwhile, in the manufacture of brick or block con, the material used is sand and cement. </span><span>More and more brick or block con who used it the more sand and cement needed in the making. </span><span>Just like clay, excessive sand excavation will damage the environment. </span><span>While the cement manufacturing process requires great energy (cement producer is the second largest energy consumer in the world).</span></p>
<p><span>For buildings using the </span><strong><span class="logo_b-panel_text">b-panel<sup class="logo_reg_text">®</sup></span></strong><span id="result_box" class="long_text" lang="en"><span>, the natural material used is sand to shotcrete work just the same amount of material required in the conventional wall plaster work. </span><span>While in the manufacture of </span></span><strong><span class="logo_b-panel_text">b-panel<sup class="logo_reg_text">®</sup></span></strong><span id="result_box" class="long_text" lang="en"><span> of its own no natural materials are used, so that the effects on nature is also less.</span></span></p>
<p><span>The use of b-panel in the building to reduce the destruction of nature so that nature can be preserved.</span></p>
<p><span>- Reduce construction waste</span></p>
<p><span>In making a conventional building, after all construction work completed will be seen a lot of junk, especially the wood used in its construction process. </span><span>Will dikemanakan garbage? </span><span>If still good, the wood can be used for future projects. </span><span>In addition, the easiest answer is burned. </span>How much wood will be burned till end of the construction work? <span>Very much if we collect from any existing projects. </span><span>And this is a waste of costs, while also when burned produce greenhouse gas emissions that should be avoided.</span></p>
<p><span>Buildings with </span><strong><span class="logo_b-panel_text">b-panel<sup class="logo_reg_text">®</sup></span></strong><span id="result_box" class="long_text" lang="en"><span> in the process of its construction, use less wood, so that at the end of the work there is not much waste is wasted.</span></span></p>
<p align="center"><img src="http://bpanel.files.wordpress.com/2009/06/kircon.jpg?w=400&amp;h=300" alt="Rumah dengan b-panel" border="0" /></p>
<p align="justify"><span id="result_box" class="long_text" lang="en"><span>From the above description can be said that the building that uses </span></span><strong><span class="logo_b-panel_text">b-panel<sup class="logo_reg_text">®</sup></span></strong><span id="result_box" class="long_text" lang="en"><span> as structure elements can be said is building an environmentally friendly and very supportive of the program &#8220;<em>GO GREEN</em>&#8221; currently being touted around the world and is something we must note.</span></span></p>
<p align="left">Source: <strong>Properti.biz June 2009</strong> [ <a title="Download artikel b-panel di Properti.biz Juni 2009" href="http://bpanel.files.wordpress.com/2009/06/06-bangunan-ramah-lingkungan-dengan-b-panel-_juni-09_-_rev_.pdf" target="_blank"><strong>PDF</strong></a> ]</p>
<p>
<strong>Related News:</strong></p>
<ul>
<li><a href="http://www.b-panel.com/sustainable-building-indonesia/">b-panel<sup>&reg;</sup> Campus Seminar: Educating Young Generation to Support Sustainable Building Practices</a></li>
<li><a href="http://www.b-panel.com/little-pt-beton-elemenindo-putra-lessen-environmental-impact/">Little Things PT Beton Elemenindo Putra Does to Further Lessen Environmental Impact</a></li>
<li><a href="http://www.b-panel.com/b-panel-support-greenship-assessment-project-green-building-council-indonesia/">b-panel<sup>&reg;</sup> to support Greenship assessment for your project by the Green Building Council Indonesia</a></li>
<li><a href="http://www.b-panel.com/june-2012-reduction-in-carbon-emission-from-the-use-of-b-panel/">Reduction in carbon emission from the use of b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/june-2012-broader-environmental-consideration-in-b-panel-production-process/">Broader environmental consideration in b-panel<sup>&reg;</sup> production process</a></li>
<li><a href="http://www.b-panel.com/april-2012-green-right-expo-2012/">Green Right Expo 2012</a></li>
<li><a href="http://www.b-panel.com/penghematan-biaya-air-conditioner/">Air Conditioner Cost Saving from Well-Insulated Dwelling</a></li>
<li><a href="http://www.b-panel.com/2011-11-designing-energy-efficient-dwelling/">Designing Energy-efficient Dwelling</a></li>
<li><a href="http://www.b-panel.com/to-sell-eco-green-product/">To Sell Eco Green Product = Production Process Must be Green First</a></li>
<li><a href="http://www.b-panel.com/2009-11-innovative-building-material-for-green-construction-civil-engineer-seminar-at-tarumanegara-university-2009-b-panel%C2%AE-marketing-team/">Innovative Building Material for Green Construction</a></li>
<li><a href="http://www.b-panel.com/2009-01-energy-efficient-housing-with-b-panel®/">Energy Efficient Housing with b-panel<sup>&reg;</sup></a></li>
<li><a href="http://www.b-panel.com/2008-06-save-energy-with-the-b-panel/">Save Energy with the b-panel<sup>&reg;</sup></a></li>
</ul>
]]></content:encoded>
			<wfw:commentRss>https://www.b-panel.com/2009-06-ecogreen-building-with-b-panel%c2%ae-properti-biz-june-2009/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
