1. Installation of scaffolding and formwork
    Install scaffolding and prepare formwork. If desired, fenolite sheeting can be applied at this stage.

  2. Panel and beam reinforcement installation
    Place panels on top of formwork, tie them to installed rebar, insert steel reinforcement into the trenches on floor panels.

  3. Concrete pouring/casting
    Cast the void between formwork and the panels with concrete mix without aggregate, followed by concrete mix with aggregate for topping up and filling of the reinforcement trenches.

  4. Finishing
    Screed surface until perfectly level. Afterwards, surface can be used to mount tiles, carpet, etc.